Use case · New single-family house
Electrical plan for a new single-family house: room by room (NEC 2023)
Building a new house? Its electrical plan starts from the rooms: receptacles every 6 ft of wall, countertops every 24 in, a switched light in each room, smoke alarms in every bedroom. Then come the required circuits (two 20 A small-appliance, laundry, bathroom, garage), the 240 V appliances and a 200 A panel. Here is what goes where in a typical 3-bedroom, 2-bath home of about 1,800 ft², under NEC 2023.
Updated on Last checked NEC (NFPA 70) 2023
Key facts
- 01Required 20 A circuits: at least 2 small-appliance circuits (kitchen, pantry, dining), laundry, bathroom and garage (210.11(C)).
- 02General lighting is sized at 3 VA per ft²: 1,800 ft² gives 5,400 VA, so at least 3 general circuits at 15 A (220.41, 210.11(A)).
- 03GFCI on kitchen, bathroom, garage, outdoor, laundry and basement receptacles; AFCI on 120 V circuits of bedrooms, living areas, kitchen, hallways, closets and laundry.
- 04Service at least 100 A; 200 A is the usual choice for a new house, with an outdoor emergency disconnect and surge protection.
- 05Smoke alarms in each bedroom, outside each sleeping area and on each story, hard-wired and interconnected (IRC R314).
Before you draw: which code applies to your lot
This page uses NEC 2023 and the IRC 2024 electrical chapters (which follow it) as the reference. Where a value is uncertain or often amended locally, it says so.
The example: a 3-bedroom, 2-bath house with an attached garage
A single-story home of about 1,800 ft²: an open kitchen with an island and a dining area, a living room, three bedrooms with closets, a hall bathroom and a primary bathroom, a laundry room, a hallway, and an attached two-car garage. Cooking and water heating are electric, heating and cooling come from a heat pump, and the garage is ready for an EV charger. Smoke and CO alarm rules apply (the attached garage alone triggers CO alarms).
| Room | Receptacles | Lighting and alarms | Protection / circuit |
|---|---|---|---|
| Living room | No point along a wall more than 6 ft from a receptacle (wall spaces 2 ft or wider) | Wall-switched lighting outlet (or a switched receptacle) | AFCI; general 15 / 20 A circuit |
| Kitchen | Countertop: no point more than 24 in from a receptacle, each counter space 12 in or wider; island: receptacle optional, but a provision (box / raceway) for a future one | Wall-switched lighting outlet (a switched receptacle is not enough) | GFCI on all receptacles + AFCI; 2 × 20 A small-appliance circuits |
| Dining area | 6 ft wall rule | Switched lighting outlet | On the small-appliance circuits; AFCI |
| Bedrooms (×3) | 6 ft wall rule | Switched lighting outlet; smoke alarm in each | AFCI; general circuits |
| Bathrooms (×2) | At least one within 3 ft of each basin | Switched lighting outlet; exhaust fan | GFCI; 20 A bathroom circuit |
| Hallway | One receptacle if 10 ft or longer | Switched light, 3-way at both ends; smoke alarm outside the bedrooms, CO alarm | AFCI |
| Laundry | At least one receptacle for the washer | Switched lighting outlet | GFCI + AFCI; 20 A laundry circuit; 30 A 240 V dryer circuit |
| Garage | At least one per vehicle bay, no higher than 5.5 ft | Switched lighting outlet | GFCI; 20 A garage circuit; EV circuit |
| Outdoors | One at the front and one at the back, no higher than 6 ft 6 in above grade; one on each deck or porch accessible from inside | Switched light at each outdoor entrance | GFCI; weather-resistant with in-use covers |
The branch circuits of a typical new house
| Circuit | Breaker / wire | Notes |
|---|---|---|
| General lighting | 15 A / 14 AWG | At least 3 general circuits for 5,400 VA (3 VA/ft²); AFCI in habitable rooms |
| General receptacles | 20 A / 12 AWG (15 A / 14 AWG acceptable) | Living room, bedrooms, hallway; AFCI |
| Small-appliance (×2) | 20 A / 12 AWG | Kitchen countertop, pantry and dining receptacles only; dual-function GFCI / AFCI |
| Bathroom | 20 A / 12 AWG | Bathroom receptacles only (or everything in one bathroom); GFCI |
| Laundry | 20 A / 12 AWG | Laundry receptacles only; GFCI + AFCI |
| Garage | 20 A / 12 AWG | Garage receptacles, may also serve outdoor receptacles; GFCI |
| Range | 40 A / 8 AWG, 240 V two-pole | 4-wire, NEMA 14-50R; 50 A / 6 AWG for a range over 12 kW |
| Dryer | 30 A / 10 AWG, 240 V two-pole | 4-wire, NEMA 14-30R |
| Water heater | 30 A / 10 AWG, 240 V two-pole | 4,500 W element, sized at 125 % |
| Dishwasher, disposal | 15 or 20 A | Often a shared 20 A circuit if the manufacturer allows; dishwasher GFCI |
| Over-the-range microwave | 20 A | Dedicated per the manufacturer's instructions (common practice) |
| Heat pump / AC | Per nameplate MCA / MOCP, 240 V two-pole | Furnace or air handler on its own 120 V or 240 V circuit |
| EV charger | 40 A / 8 AWG for a 32 A charger | Individual circuit, breaker at least 125 % of the charger rating (625.40) |
There is no NEC limit on the number of receptacles or lights per dwelling branch circuit; electricians use their own rules of thumb and some jurisdictions add local limits. The receptacle and kitchen rules are detailed in NEC 210.52 receptacle spacing and GFCI and AFCI requirements by room.
Service size and the 200 A panel
The NEC minimum for a one-family dwelling is a 100 A service (230.79(C)). An all-electric house with a range, dryer, water heater, heat pump and an EV charger will usually need 200 A, which the load calculation confirms: the optional method (220.82) takes 3 VA/ft², 1,500 VA per small-appliance and laundry circuit and the nameplate of every fastened appliance, counts 10,000 VA at 100 % and the rest at 40 %, then adds the heat pump. See residential load calculation (NEC 220).
- A 200 A load center with 40 spaces is typical; 120 V circuits use one space, 240 V circuits a two-pole breaker across both lines.
- Leave spare spaces for later (practice is around 20 %), for example a second EV charger or a battery.
- Outdoor emergency disconnect (230.85) and a surge protective device at the service (230.67).
- Working space 30 in wide, 36 in deep, 6.5 ft high in front of the panel; not in a bathroom or a clothes closet. A garage or utility room wall is the usual spot.
- Neutral and ground are bonded only at the service; any subpanel keeps them separate.
- Every circuit is identified in the panel directory (408.4): see the panel schedule template.
Smoke and CO alarms
The IRC requires smoke alarms in each sleeping room, outside each sleeping area in the immediate vicinity of the bedrooms and on each story, including basements. They are powered from the building wiring with battery backup, with no switch other than the breaker, and interconnected so that one sounding sets off all (R314). A house with fuel-burning appliances or an attached garage also needs CO alarms outside each sleeping area and on each story (R315); combination smoke / CO alarms are allowed. In the example house, that means three bedroom alarms plus a combination alarm in the hallway.
Permit and inspections for a new house
On a new house, the electrical work is usually done by a licensed electrical contractor who pulls the electrical permit. Many jurisdictions allow a homeowner to pull a permit for their own single-family home; rules vary by state and city. The plan is reviewed, then inspected at rough-in (boxes, cable, grounding, before insulation) and at final (devices, GFCI / AFCI, panel directory, alarms). The utility energizes the service after the inspection. The drawing itself is covered in how to draw an electrical plan for a permit.
Drawing the house in Circuia
Draw the rooms on the grid in feet and inches and label them (kitchen, bedroom, bathroom, garage…). Equip the rooms places receptacles by the 210.52 rules (6 ft wall rule, 24 in countertop rule, 3 ft from basins, hallways of 10 ft or more) and a switched lighting outlet in each room. Automatic wiring builds the circuits: 14 AWG / 15 A lighting, 12 AWG / 20 A receptacles, the two 20 A small-appliance circuits, a 20 A bathroom circuit and 240 V two-pole circuits for the range, water heater and EV charger. The check flags missing GFCI or AFCI protection, wire sizes that don't match breakers, missing small-appliance circuits and more.
Export on Letter paper: floor plan with symbols, panel schedule, single-line diagram and materials list, and send a share link to your client or builder. Drawing and checking are free; the Project Pass ($45 one-off, plus sales tax) unlocks the PDFs and materials list for one home.
Draw your house in the editor, free, in your browser.
Common mistakes
- Counting only furniture walls: every wall space 2 ft or wider counts for the 6 ft rule.
- Putting lighting or receptacles from other rooms on a small-appliance circuit (it serves kitchen, pantry and dining receptacles only; the refrigerator may instead have its own 15 A or larger circuit).
- Forgetting the receptacle in the hallway or the outdoor receptacle at the back of the house.
- Undersizing the panel: no spare spaces left for an EV charger or a heat pump later.
- Smoke alarms in bedrooms only, without the one in the hallway and on each story, or not interconnected.
Frequently asked questions
What size electrical service does a new house need?
How many circuits does a 3-bedroom house need?
Which rooms need AFCI and which need GFCI?
Where do smoke alarms go in a new house?
Can Circuia design the whole house electrical plan?
Design aid
Design the installation with this country's rules
Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.
Written by
Circuia team
Written by the Circuia team from the sources listed and from the editor's rules pack for this country: the values in the tables are the ones Circuia uses.
Published · updated
Sources
Sources used for this page, official texts first:
- NFPA 70 National Electrical Code 2023 — free read-only access
- ICC — IRC R314 smoke alarms (PDF)
- City of Boise — IRC smoke and CO alarm handout
- NAHB — 2023 National Electrical Code adoption kit
- IAEI Magazine — major changes in the 2023 NEC
- EC&M — what's cooking in the kitchen for the 2023 NEC
- Open Exam Prep — IRC E3901 dwelling receptacle outlet spacing
- Expertce — residential load calculation (NEC 220)
Related pages
- GuideNEC 2023 for homes: the residential rules that matter (National Electrical Code)NEC 2023 for one- and two-family homes: required circuits, receptacle spacing, GFCI/AFCI, wire sizes, panel and permits. Plus a free NEC compliance check.
- GuideHow to draw an electrical plan for a permit (US homes, NEC 2023)What US permit offices ask for on a residential electrical plan: receptacles, lights, smoke alarms, panel schedule, load calc and symbols, step by step.
- GuideResidential load calculation (NEC 220) explained, with a worked exampleNEC Article 220 load calculation for a house: 3 VA/ft², demand factors, range, dryer and EV loads, standard vs optional method, worked 2,000 ft² example.
- GuideGFCI vs AFCI requirements by room (NEC 2023)Which rooms need GFCI, AFCI or both under NEC 2023 (210.8, 210.12): room-by-room table, breaker vs receptacle, 2023 appliance rules, 2026 changes.
- CircuiaPricing: free, Project Pass €29, Pro €49/monthCircuia plans: Free to explore, Project Pass at €29 incl. VAT for a homeowner project, Pro at €49 excl. VAT/month and Team at €129 excl. VAT/month for electricians. 14-day trial.