Skip to content
circuia
Editor

The country sets the standard for new projects and the currency.

Use case · Renovating a one-bed flat

The electrical plan of a one-bedroom flat, ready before you move in

Renovating a one-bedroom flat before moving in? Draw the six spaces of a 43 m² flat in Circuia: living room, kitchen, bedroom, hall, bathroom and WC. The editor suggests the points, builds the circuits and the consumer unit, and checks them against BS 7671:2018+A4:2026 (beta). You get a clear plan to hand to electricians, so their quotes cover the same job.

BS 7671:2018+A4:2026 · beta

Demo: a 43 m² one-bed flat from floor plan to consumer unit

Demo video

What the video shows, step by step

  1. We import the estate agent's floor plan as a background and trace the walls: living room, kitchen, bedroom, hall, bathroom and WC.
  2. “Equip the rooms” places Circuia’s suggested layout (BS 7671 sets no minimum per room): sockets and a switched lighting point in each room, plus the cooker and appliance outlets in the kitchen.
  3. We add a washing machine and a dishwasher; anything above 3 kW gets its own circuit.
  4. Automatic wiring builds the circuits and puts them behind 30 mA RCD protection.
  5. The consumer unit appears with its schedule, and the single-line diagram follows every change.
  6. No issues left: the PDF pack (plan, consumer unit, single-line diagram, materials) is ready for the electrician.

What goes on a one-bed flat's plan

Example one-bedroom flat of 43 m² in Circuia
RoomAreaTypical points
Living room18 m²Double sockets on each wall, TV and data points, ceiling light
Kitchen7 m²Worktop sockets, cooker or hob, fridge, washing machine, dishwasher, extractor
Bedroom10 m²Sockets either side of the bed, ceiling light
Hall3 m²Consumer unit, light switched from the door
Bathroom4 m²Lighting, extractor fan; no 230 V socket within 2.5 m of zone 1
WC1 m²Light and extractor fan
Example areas. Outside Scotland BS 7671 sets no socket minimum per room: these are the points Circuia suggests.

Circuits and consumer unit of a one-bed flat

  • Sockets: one ring B32 on 2.5 mm² covers up to 100 m²; the pack expects at least two socket circuits and suggests a separate one for the kitchen.
  • Lighting: B6 on 1.5 mm².
  • Kitchen: cooker B32 on 6 mm²; appliance radials B20 on 2.5 mm² for loads above 3 kW.
  • Protection: 30 mA RCDs, a type 2 surge protective device at the origin, and AFDDs recommended on socket circuits.

With the plan, the consumer unit schedule and the materials list, every electrician quotes on the same basis. See prices for the exports.

Bathroom and kitchen: what BS 7671 requires

Bathroom: zones 0, 1 and 2, up to 2.25 m high; zone 2 extends 0.6 m beyond zone 1. Every circuit in the room is behind a 30 mA RCD, and 230 V sockets stay at least 2.5 m from zone 1.

Kitchen: the cooker on its own circuit (B32), heavy appliances off the ring, worktop sockets clear of the sink. More in the BS 7671 guide.

Plans

Plans
PlanPriceWho it's forIncluded
Free£0ExplorePlan editor (electrical and plumbing) · Real-time checks against your country's rules · Consumer unit suggested automatically · Up to 3 active projects
Project Pass£35 incl. VATHomeownersPDF export: plan, consumer unit and single-line diagram · Detailed bill of materials · AI assistant included (account required)
Pro£45 excl. VAT / monthElectriciansUnlimited projects · PDF exports with your business details · Bill of materials and quote basis
All prices →

Other use cases

Frequently asked questions

How many circuits does a one-bed flat need?

Typically a lighting circuit, at least two socket circuits (often one for the kitchen), a cooker circuit and dedicated circuits for any appliance above 3 kW, an immersion heater or an electric shower. Circuia creates them from the points you place.

Can I use the plan to compare quotes?

Yes: the dimensioned plan, the consumer unit schedule and the materials list give each electrician the same basis, so quotes can be compared line by line.

Is the plan compliant once the check is green?

No software can promise that. The UK pack is in beta and has not yet been reviewed by a UK electrician. A registered electrician carries out or checks the work, issues the Electrical Installation Certificate and notifies it under Part P where required.

What does it cost?

The plan, automatic equipment and checks are free. The Project Pass (£35 incl. VAT, one-off) adds PDF exports and the materials list for that home.

Design aid

Plan your flat before moving in

Draw the rooms or import the agent's floor plan: the consumer unit and the BS 7671 checks follow.

Draw my plan for free