Template · United States · NEC 408.4
Panel schedule template for a house (NEC 408.4 circuit directory)
A panel schedule (or circuit directory) lists every breaker in the load center with its number, rating, poles, wire size, what it feeds and how it is protected. The NEC requires it: 408.4(A) says every circuit must be legibly identified by its purpose, and spare positions described. Below: the columns to use, a filled example for a 200 A three-bedroom house split between lines L1 and L2, and the rules for the space around the panel.
Updated on Last checked NEC (NFPA 70) 2023
Key facts
- 01408.4(A): every circuit and circuit modification is legibly identified as to its specific purpose or use; spares are described too. Vague labels such as "general" or "plugs" are commonly rejected.
- 02Useful columns: circuit number, breaker (A), poles, wire size (AWG), description, GFCI / AFCI, load (VA) and the line (L1 / L2).
- 03120 V circuits use a 1-pole breaker; 240 V loads (range, dryer, water heater, EV charger, A/C) use a 2-pole common-trip breaker spanning L1 and L2 (240.15(B)).
- 04Copper wire vs breaker (240.4(D)): 14 AWG ≤ 15 A, 12 AWG ≤ 20 A, 10 AWG ≤ 30 A.
- 05Working space in front of the panel (110.26(A)): 30 in wide, 36 in deep, 6.5 ft high, and never in a bathroom or a clothes closet (240.24).
What a panel schedule is, and what NEC 408.4 requires
Open the door of any US load center and you should find a card or label listing the circuits. That list is the circuit directory required by NEC 408.4(A): every circuit, and every modification of a circuit, must be legibly identified as to its purpose or use, and spare positions must be identified as well. The directory is usually a card inside the panel door.
A panel schedule is the design version of the same thing: a table, usually on the permit drawings, that lists each breaker with its rating, poles, wire size, load and protection. Electricians use it to build the panel, inspectors check it at the final, and the homeowner uses the directory to find the right breaker years later. The inspection checklist Circuia's spec follows includes "directory complete (408.4)" at the final inspection.
The columns of a residential panel schedule
| Column | What to write | Why |
|---|---|---|
| Circuit # | Position in the panel (odd numbers on the left, even on the right in most load centers) | Matches the number printed next to the breaker |
| Line | L1, L2, or L1 + L2 for a 2-pole breaker | Lets you check the balance between the two lines |
| Breaker (A) | 15, 20, 30, 40, 50… | Must not exceed what the wire allows (240.4(D)) |
| Poles | 1 (120 V) or 2 (240 V, or a multiwire branch circuit) | 2-pole common trip for 240 V loads (240.15(B)) |
| Wire | 14 AWG, 12 AWG, 10 AWG… and cable type (NM-B, THHN) | NM-B is sized at the 60 °C column (334.80) |
| Description | Room and use: "Kitchen countertop receptacles, sink wall (SA-1)" | 408.4(A): specific purpose, not "general" |
| Protection | GFCI, AFCI, dual-function, or none | Shows compliance with 210.8 and 210.12 at a glance |
| Load (VA) | Nameplate or planning estimate | Feeds the load calculation and the L1 / L2 balance |
In most load centers the positions alternate between the two lines as you go down the panel: positions 1 and 2 are on L1, 3 and 4 on L2, 5 and 6 on L1 again, and so on. A 2-pole breaker therefore always takes one position on each line. Check the label of your panel: tandem (twin) breakers and other layouts change the count, and tandems are only allowed where the panel is listed for them (408.54).
Filled example: 200 A panel, three-bedroom house
The example below is a typical single-story three-bedroom house with an electric range and dryer, an electric water heater, a Level 2 EV charger, central air and a gas furnace, on a 200 A main-breaker panel. The VA column holds planning estimates, not nameplate values.
| Circuit | Line | Breaker | Wire | Description | Protection | VA |
|---|---|---|---|---|---|---|
| 1 / 3 | L1 + L2 | 40 A 2P | 8 AWG | Range, kitchen | GFCI (2023, check AHJ) | 8,000 |
| 2 / 4 | L1 + L2 | 30 A 2P | 10 AWG | Clothes dryer, laundry | GFCI (2023, check AHJ) | 5,000 |
| 5 / 7 | L1 + L2 | 30 A 2P | 10 AWG | Water heater 4,500 W, utility room | — | 4,500 |
| 6 / 8 | L1 + L2 | 40 A 2P | 8 AWG | EV charger 32 A, garage | GFCI if a receptacle (625.54) | 7,680 |
| 9 | L1 | 20 A 1P | 12 AWG | Kitchen countertop receptacles, sink wall (SA-1) | Dual-function | 1,500 |
| 10 | L1 | 20 A 1P | 12 AWG | Bathroom receptacles, hall bath + primary bath | GFCI | 1,500 |
| 11 | L2 | 20 A 1P | 12 AWG | Kitchen island + dining room receptacles (SA-2) | Dual-function | 1,500 |
| 12 | L2 | 20 A 1P | 12 AWG | Laundry receptacles | Dual-function | 1,500 |
| 13 | L1 | 20 A 1P | 12 AWG | Dishwasher + disposal | Dual-function | 1,800 |
| 14 | L1 | 15 A 1P | 14 AWG | Lighting: kitchen, dining, living room, hallway | AFCI | 600 |
| 15 | L2 | 20 A 1P | 12 AWG | Microwave over the range | Dual-function | 1,500 |
| 16 | L2 | 20 A 1P | 12 AWG | Garage receptacles | GFCI | 1,500 |
| 17 | L1 | 15 A 1P | 14 AWG | Primary bedroom + closet, receptacles and lighting | AFCI | 1,000 |
| 18 | L1 | 20 A 1P | 12 AWG | Outdoor receptacles, front and back | GFCI | 1,000 |
| 19 | L2 | 15 A 1P | 14 AWG | Bedrooms 2 and 3, receptacles and lighting, smoke alarms | AFCI | 1,200 |
| 20 | L2 | 15 A 1P | 14 AWG | Living / family room receptacles | AFCI | 1,500 |
| 21 | L1 | 15 A 1P | 14 AWG | Bathroom lighting and exhaust fans, exterior lighting | — | 600 |
| 22 | L1 | 20 A 1P | 12 AWG | Basement receptacles (unfinished) | GFCI | 1,500 |
| 23 / 25 | L2 + L1 | 30 A 2P | 10 AWG | A/C condenser (size to nameplate MCA / MOCP) | Check 210.8(F) | 5,000 |
| 24 | L2 | 15 A 1P | 14 AWG | Gas furnace / air handler (individual circuit) | — | 800 |
| 26 | L1 | — | — | Spare | — | — |
Each line of the example follows a rule you can check: the 2 small-appliance circuits of 20 A (210.11(C)(1)), the 20 A bathroom circuit (210.11(C)(3)), the 20 A laundry and garage circuits (210.11(C)(2) and (4)), 12 AWG on every 20 A breaker and 14 AWG on every 15 A breaker (240.4(D)), and an EV breaker at 125 % of the charger current (625.40). The A/C breaker and wire come from the nameplate of the unit (440).
Balancing L1 and L2, and leaving spares
- Balance the 120 V circuits between L1 and L2 so the neutral carries as little current as possible and neither leg of the service runs much hotter than the other. Two-pole loads are balanced by construction.
- Multiwire branch circuits (a 12/3 cable feeding two circuits with a shared neutral) must have their two hots on opposite lines and be disconnected together by a 2-pole breaker or a listed handle tie (210.4).
- Leave spare spaces. A common practice is about 20 % of the positions free for a future EV charger, heat pump or battery. A 200 A panel commonly has 40 spaces. Label every spare as "Spare" in the directory.
Where the panel goes: working space (110.26) and location
| Rule | Value | Section |
|---|---|---|
| Working space width | 30 in, or the width of the equipment if larger | 110.26(A) |
| Working space depth | 36 in (0–150 V to ground); measured from the enclosure front in the 2026 edition | 110.26(A) |
| Working space height | 6.5 ft, with dedicated space above the panel | 110.26(A) |
| Forbidden locations | Bathrooms, clothes closets, over stair steps, near easily ignitible material | 240.24(D)(E)(F) |
| Highest breaker handle | No higher than 6 ft 7 in | 240.24, 404.8(A) |
The working space has to stay clear: no shelves, no water heater, no washing machine in front of the panel. Plan it on the floor plan before you place the laundry or storage.
Labeling tips that pass inspection
- Name the room and the use: "Bedroom 2, receptacles and lighting" rather than "Bedroom", and "Kitchen countertop SA-1" rather than "Kitchen".
- Use the names the homeowner will recognize, not "Room 3" from the drawing. A label that only makes sense while a particular person lives there ("Jake's room") ages badly.
- Write legibly, in permanent ink or printed, and update the directory whenever a circuit is added or changed (408.4(A) covers modifications).
- Mark the type of protection: inspectors look for GFCI and AFCI at a glance, and the homeowner will know where to reset a tripped circuit.
- Keep a copy of the schedule with the permit documents and in the house file.
Generating the panel schedule with Circuia
In Circuia you draw the plan and place the outlets; auto-wire groups them into circuits, assigns the breaker and wire size, uses 2-pole breakers for 240 V loads and places each circuit on L1 or L2. The compliance check flags missing GFCI (210.8) and AFCI (210.12) protection, wire too small for its breaker (240.4(D)), a missing small-appliance or bathroom circuit, and warns when L1 and L2 differ by more than about 20 A. The PDF, on Letter paper with imperial units, includes the panel schedule / circuit directory (408.4) ready to print.
Open the editor set up for the United States — free to start in your browser. Plans: a one-off Project Pass at $45 or Pro at $55 per month, plus sales tax.
Common mistakes
- Leaving positions labeled "general", "plugs" or blank: 408.4(A) wants the specific purpose of every circuit.
- Putting both hots of a multiwire branch circuit on the same line, which overloads the shared neutral.
- A 20 A breaker on 14 AWG wire (240.4(D) limits 14 AWG copper to 15 A).
- Using tandem breakers in a panel that is not listed for them (408.54).
- Stacking every 20 A kitchen and laundry circuit on L1 and the lighting on L2.
- Locating the panel in a clothes closet or a bathroom, or blocking its 30 in × 36 in working space.
Frequently asked questions
What does NEC 408.4 require on a panel directory?
Which columns should a residential panel schedule have?
How do I know which breakers are on L1 and L2?
How much space is required in front of an electrical panel?
How many spare spaces should a house panel have?
Can Circuia generate a panel schedule for my permit?
Design aid
Design the installation with this country's rules
Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.
Written by
Circuia team
Written by the Circuia team from the sources listed and from the editor's rules pack for this country: the values in the tables are the ones Circuia uses.
Published · updated
Sources
Sources used for this page, official texts first:
Related pages
- GuideNEC 2023 for homes: the residential rules that matter (National Electrical Code)NEC 2023 for one- and two-family homes: required circuits, receptacle spacing, GFCI/AFCI, wire sizes, panel and permits. Plus a free NEC compliance check.
- GuideGFCI vs AFCI requirements by room (NEC 2023)Which rooms need GFCI, AFCI or both under NEC 2023 (210.8, 210.12): room-by-room table, breaker vs receptacle, 2023 appliance rules, 2026 changes.
- GuideResidential load calculation (NEC 220) explained, with a worked exampleNEC Article 220 load calculation for a house: 3 VA/ft², demand factors, range, dryer and EV loads, standard vs optional method, worked 2,000 ft² example.
- GuideHow to draw an electrical plan for a permit (US homes, NEC 2023)What US permit offices ask for on a residential electrical plan: receptacles, lights, smoke alarms, panel schedule, load calc and symbols, step by step.
- CircuiaPricing: free, Project Pass €29, Pro €49/monthCircuia plans: Free to explore, Project Pass at €29 incl. VAT for a homeowner project, Pro at €49 excl. VAT/month and Team at €129 excl. VAT/month for electricians. 14-day trial.