Skip to content
circuia
Editor

The country sets the standard for new projects and the currency.

Template · United States · NEC 408.4

Panel schedule template for a house (NEC 408.4 circuit directory)

A panel schedule (or circuit directory) lists every breaker in the load center with its number, rating, poles, wire size, what it feeds and how it is protected. The NEC requires it: 408.4(A) says every circuit must be legibly identified by its purpose, and spare positions described. Below: the columns to use, a filled example for a 200 A three-bedroom house split between lines L1 and L2, and the rules for the space around the panel.

Updated on Last checked NEC (NFPA 70) 2023

Key facts

  • 01408.4(A): every circuit and circuit modification is legibly identified as to its specific purpose or use; spares are described too. Vague labels such as "general" or "plugs" are commonly rejected.
  • 02Useful columns: circuit number, breaker (A), poles, wire size (AWG), description, GFCI / AFCI, load (VA) and the line (L1 / L2).
  • 03120 V circuits use a 1-pole breaker; 240 V loads (range, dryer, water heater, EV charger, A/C) use a 2-pole common-trip breaker spanning L1 and L2 (240.15(B)).
  • 04Copper wire vs breaker (240.4(D)): 14 AWG ≤ 15 A, 12 AWG ≤ 20 A, 10 AWG ≤ 30 A.
  • 05Working space in front of the panel (110.26(A)): 30 in wide, 36 in deep, 6.5 ft high, and never in a bathroom or a clothes closet (240.24).

What a panel schedule is, and what NEC 408.4 requires

Open the door of any US load center and you should find a card or label listing the circuits. That list is the circuit directory required by NEC 408.4(A): every circuit, and every modification of a circuit, must be legibly identified as to its purpose or use, and spare positions must be identified as well. The directory is usually a card inside the panel door.

A panel schedule is the design version of the same thing: a table, usually on the permit drawings, that lists each breaker with its rating, poles, wire size, load and protection. Electricians use it to build the panel, inspectors check it at the final, and the homeowner uses the directory to find the right breaker years later. The inspection checklist Circuia's spec follows includes "directory complete (408.4)" at the final inspection.

The columns of a residential panel schedule

Panel schedule template — what to put in each column
ColumnWhat to writeWhy
Circuit #Position in the panel (odd numbers on the left, even on the right in most load centers)Matches the number printed next to the breaker
LineL1, L2, or L1 + L2 for a 2-pole breakerLets you check the balance between the two lines
Breaker (A)15, 20, 30, 40, 50…Must not exceed what the wire allows (240.4(D))
Poles1 (120 V) or 2 (240 V, or a multiwire branch circuit)2-pole common trip for 240 V loads (240.15(B))
Wire14 AWG, 12 AWG, 10 AWG… and cable type (NM-B, THHN)NM-B is sized at the 60 °C column (334.80)
DescriptionRoom and use: "Kitchen countertop receptacles, sink wall (SA-1)"408.4(A): specific purpose, not "general"
ProtectionGFCI, AFCI, dual-function, or noneShows compliance with 210.8 and 210.12 at a glance
Load (VA)Nameplate or planning estimateFeeds the load calculation and the L1 / L2 balance

In most load centers the positions alternate between the two lines as you go down the panel: positions 1 and 2 are on L1, 3 and 4 on L2, 5 and 6 on L1 again, and so on. A 2-pole breaker therefore always takes one position on each line. Check the label of your panel: tandem (twin) breakers and other layouts change the count, and tandems are only allowed where the panel is listed for them (408.54).

Filled example: 200 A panel, three-bedroom house

The example below is a typical single-story three-bedroom house with an electric range and dryer, an electric water heater, a Level 2 EV charger, central air and a gas furnace, on a 200 A main-breaker panel. The VA column holds planning estimates, not nameplate values.

Panel schedule — 200 A main breaker, 120/240 V, three-bedroom house (NEC 2023)
CircuitLineBreakerWireDescriptionProtectionVA
1 / 3L1 + L240 A 2P8 AWGRange, kitchenGFCI (2023, check AHJ)8,000
2 / 4L1 + L230 A 2P10 AWGClothes dryer, laundryGFCI (2023, check AHJ)5,000
5 / 7L1 + L230 A 2P10 AWGWater heater 4,500 W, utility room—4,500
6 / 8L1 + L240 A 2P8 AWGEV charger 32 A, garageGFCI if a receptacle (625.54)7,680
9L120 A 1P12 AWGKitchen countertop receptacles, sink wall (SA-1)Dual-function1,500
10L120 A 1P12 AWGBathroom receptacles, hall bath + primary bathGFCI1,500
11L220 A 1P12 AWGKitchen island + dining room receptacles (SA-2)Dual-function1,500
12L220 A 1P12 AWGLaundry receptaclesDual-function1,500
13L120 A 1P12 AWGDishwasher + disposalDual-function1,800
14L115 A 1P14 AWGLighting: kitchen, dining, living room, hallwayAFCI600
15L220 A 1P12 AWGMicrowave over the rangeDual-function1,500
16L220 A 1P12 AWGGarage receptaclesGFCI1,500
17L115 A 1P14 AWGPrimary bedroom + closet, receptacles and lightingAFCI1,000
18L120 A 1P12 AWGOutdoor receptacles, front and backGFCI1,000
19L215 A 1P14 AWGBedrooms 2 and 3, receptacles and lighting, smoke alarmsAFCI1,200
20L215 A 1P14 AWGLiving / family room receptaclesAFCI1,500
21L115 A 1P14 AWGBathroom lighting and exhaust fans, exterior lighting—600
22L120 A 1P12 AWGBasement receptacles (unfinished)GFCI1,500
23 / 25L2 + L130 A 2P10 AWGA/C condenser (size to nameplate MCA / MOCP)Check 210.8(F)5,000
24L215 A 1P14 AWGGas furnace / air handler (individual circuit)—800
26L1——Spare——
120 V loads in this example: L1 = 9,500 VA, L2 = 9,500 VA; the 2-pole loads split evenly. Smoke alarms ride on a habitable-room lighting or receptacle circuit, which can be AFCI-protected (IRC R314). Bathrooms are not on the AFCI list of 210.12(A); some AHJs add them.

Each line of the example follows a rule you can check: the 2 small-appliance circuits of 20 A (210.11(C)(1)), the 20 A bathroom circuit (210.11(C)(3)), the 20 A laundry and garage circuits (210.11(C)(2) and (4)), 12 AWG on every 20 A breaker and 14 AWG on every 15 A breaker (240.4(D)), and an EV breaker at 125 % of the charger current (625.40). The A/C breaker and wire come from the nameplate of the unit (440).

Balancing L1 and L2, and leaving spares

  • Balance the 120 V circuits between L1 and L2 so the neutral carries as little current as possible and neither leg of the service runs much hotter than the other. Two-pole loads are balanced by construction.
  • Multiwire branch circuits (a 12/3 cable feeding two circuits with a shared neutral) must have their two hots on opposite lines and be disconnected together by a 2-pole breaker or a listed handle tie (210.4).
  • Leave spare spaces. A common practice is about 20 % of the positions free for a future EV charger, heat pump or battery. A 200 A panel commonly has 40 spaces. Label every spare as "Spare" in the directory.

Where the panel goes: working space (110.26) and location

Panel location and clearances in a dwelling
RuleValueSection
Working space width30 in, or the width of the equipment if larger110.26(A)
Working space depth36 in (0–150 V to ground); measured from the enclosure front in the 2026 edition110.26(A)
Working space height6.5 ft, with dedicated space above the panel110.26(A)
Forbidden locationsBathrooms, clothes closets, over stair steps, near easily ignitible material240.24(D)(E)(F)
Highest breaker handleNo higher than 6 ft 7 in240.24, 404.8(A)

The working space has to stay clear: no shelves, no water heater, no washing machine in front of the panel. Plan it on the floor plan before you place the laundry or storage.

Labeling tips that pass inspection

  • Name the room and the use: "Bedroom 2, receptacles and lighting" rather than "Bedroom", and "Kitchen countertop SA-1" rather than "Kitchen".
  • Use the names the homeowner will recognize, not "Room 3" from the drawing. A label that only makes sense while a particular person lives there ("Jake's room") ages badly.
  • Write legibly, in permanent ink or printed, and update the directory whenever a circuit is added or changed (408.4(A) covers modifications).
  • Mark the type of protection: inspectors look for GFCI and AFCI at a glance, and the homeowner will know where to reset a tripped circuit.
  • Keep a copy of the schedule with the permit documents and in the house file.

Generating the panel schedule with Circuia

In Circuia you draw the plan and place the outlets; auto-wire groups them into circuits, assigns the breaker and wire size, uses 2-pole breakers for 240 V loads and places each circuit on L1 or L2. The compliance check flags missing GFCI (210.8) and AFCI (210.12) protection, wire too small for its breaker (240.4(D)), a missing small-appliance or bathroom circuit, and warns when L1 and L2 differ by more than about 20 A. The PDF, on Letter paper with imperial units, includes the panel schedule / circuit directory (408.4) ready to print.

Open the editor set up for the United States — free to start in your browser. Plans: a one-off Project Pass at $45 or Pro at $55 per month, plus sales tax.

Common mistakes

  • Leaving positions labeled "general", "plugs" or blank: 408.4(A) wants the specific purpose of every circuit.
  • Putting both hots of a multiwire branch circuit on the same line, which overloads the shared neutral.
  • A 20 A breaker on 14 AWG wire (240.4(D) limits 14 AWG copper to 15 A).
  • Using tandem breakers in a panel that is not listed for them (408.54).
  • Stacking every 20 A kitchen and laundry circuit on L1 and the lighting on L2.
  • Locating the panel in a clothes closet or a bathroom, or blocking its 30 in × 36 in working space.

Frequently asked questions

What does NEC 408.4 require on a panel directory?

Section 408.4(A) requires every circuit and circuit modification to be legibly identified as to its purpose or use, usually on a directory card inside the panel door. Spare positions must be described as well. In practice inspectors expect the room and the use of each circuit, and commonly reject vague labels such as "general" or "plugs". Check how your AHJ applies it.

Which columns should a residential panel schedule have?

At minimum: circuit number, breaker rating, number of poles, wire size and a description of the room and use. Adding the line (L1 or L2), the protection type (GFCI, AFCI or dual-function) and an estimated load in volt-amperes makes the schedule useful for checking balance and for the load calculation. Spare positions should be listed too.

How do I know which breakers are on L1 and L2?

In most residential load centers the positions alternate between the two lines going down the panel: positions 1 and 2 on L1, 3 and 4 on L2, and so on, with odd numbers on the left and even numbers on the right. A 2-pole breaker always spans both lines. Tandem breakers and some panel designs change this, so check the label inside your panel door.

How much space is required in front of an electrical panel?

Section 110.26(A) requires a working space at least 30 inches wide (or the width of the equipment), 36 inches deep for systems up to 150 V to ground, and 6.5 feet high, kept clear of storage. The 2026 edition measures the depth from the front of the enclosure. A panel may not be installed in a bathroom, a clothes closet or over stair steps.

How many spare spaces should a house panel have?

The NEC does not set a number. A common design practice is to leave about 20 % of the spaces free for future loads such as an EV charger, a heat pump or a battery system, and a 200 A panel commonly has 40 spaces. Every spare position should still be identified as "Spare" in the circuit directory required by 408.4(A).

Can Circuia generate a panel schedule for my permit?

Yes. Circuia's auto-wire builds the circuits from your plan, and the PDF on Letter paper includes a panel schedule and circuit directory with breakers, poles, wire sizes, rooms and GFCI / AFCI protection. The US rules pack has not been reviewed by a US master electrician, so have the schedule checked by a licensed electrician; the AHJ decides what it accepts with the permit.

Design aid

Design the installation with this country's rules

Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.

Open a free sample plan with these rules

Written by

Circuia team

Written by the Circuia team from the sources listed and from the editor's rules pack for this country: the values in the tables are the ones Circuia uses.

Published · updated