Use case · Renovating a studio flat
Your studio flat's electrical plan, drawn online and checked against BS 7671
Renovating a 25–30 m² studio flat? Draw the main room, kitchenette and shower room in Circuia: the editor suggests sockets and lighting points, groups them into circuits behind 30 mA RCDs and flags anything that conflicts with BS 7671:2018+A4:2026. The UK rules pack is in beta, and the work itself stays with a registered electrician. Free to start, nothing to install.
BS 7671:2018+A4:2026 · beta
Demo: a studio flat's electrical plan in one minute
Demo video
What the video shows, step by step
- We draw the walls of the studio on the grid: a main room, a kitchenette and a shower room. Floor areas appear on their own.
- One click on “Equip the rooms” places Circuia’s suggested layout (BS 7671 sets no minimum per room): sockets and a switched lighting point in each room, plus the cooker and appliance outlets in the kitchenette.
- In the shower room, zones 0, 1 and 2 are drawn around the tray; a socket dropped too close is flagged straight away.
- Automatic wiring groups the points into circuits: a ring or radial for the sockets, a lighting circuit, a dedicated cooker circuit.
- The consumer unit fills in: 30 mA RCD protection, circuit breakers, surge protection at the origin.
- The check turns green, and the plan, consumer unit schedule, single-line diagram and materials list export as PDFs.
What goes on a studio flat's plan
Example: a 27 m² studio with a main room of about 19 m² (living and sleeping), an open kitchenette and a shower room. In England and Wales BS 7671 sets no minimum number of sockets per room, so Circuia suggests a practical layout and checks how the circuits are built; in Scotland the pack also applies the socket counts of Standard 4.6.
| Room | Points | Circuit |
|---|---|---|
| Main room | Double sockets around the room, TV and data points, ceiling light | Sockets on a ring (B32, 2.5 mm²) or a 20 A radial |
| Kitchenette | Worktop sockets, fridge, cooker or hob, extractor | Cooker circuit B32 on 6 mm²; appliances above 3 kW on their own circuit |
| Shower room | No 230 V socket within 2.5 m of zone 1 | Lighting and any electric shower behind a 30 mA RCD |
Typical circuits in a studio flat
- Sockets: a ring final circuit B32 on 2.5 mm² serves up to 100 m²; a 20 A radial on 2.5 mm² up to 50 m².
- Lighting: B6 on 1.5 mm².
- Cooker: B32 on 6 mm², via a cooker control unit.
- Immersion heater: B16 on 2.5 mm², never on the ring.
- RCD protection: 30 mA additional protection for sockets, lighting and everything in the shower room.
Each value comes from the editor's UK rules pack, explained in the BS 7671 guide.
Shower room and kitchenette: what to watch
Shower room: zones 0, 1 and 2 only. Zone 1 rises to 2.25 m above the tray, zone 2 extends 0.6 m beyond it, and 230 V sockets must sit at least 2.5 m horizontally from the boundary of zone 1. Work in a bath or shower location is notifiable in England.
Kitchenette: space is tight, so keep worktop sockets clear of the sink and hob, give the cooker its own circuit and put any appliance above 3 kW on a dedicated circuit rather than on the ring.
Plans
| Plan | Price | Who it's for | Included |
|---|---|---|---|
| Free | £0 | Explore | Plan editor (electrical and plumbing) · Real-time checks against your country's rules · Consumer unit suggested automatically · Up to 3 active projects |
| Project Pass | £35 incl. VAT | Homeowners | PDF export: plan, consumer unit and single-line diagram · Detailed bill of materials · AI assistant included (account required) |
| Pro | £45 excl. VAT / month | Electricians | Unlimited projects · PDF exports with your business details · Bill of materials and quote basis |
Other use cases
- Use case · Renovating a one-bed flatElectrical plan for a one-bed flatPlan a one-bed flat's electrics before you move in: living room, kitchen, bedroom, bathroom and consumer unit checked against BS 7671 (beta), online.
- Use case · House + solar PVHouse with solar panelsPlan a two-storey house with solar panels online: PV inverter on its own circuit, consumer unit, single-line diagram and BS 7671 checks (beta).
- For electriciansCircuia for electriciansCircuia for UK electricians: plan, consumer unit schedule and single-line diagram built to BS 7671 (beta), materials list and client PDF. 14-day trial.
Frequently asked questions
How many sockets does a studio flat need?
Does every circuit need an RCD?
Is the plan certified or BS 7671 compliant?
Is it free?
Design aid
Draw your studio flat now
The walls, then one click: Circuia places the points, builds the consumer unit and checks the UK rules as you go.