Skip to content
circuia
Editor

The country sets the standard for new projects and the currency.

Free tool · No sign-up

What supply do I need? Subscription, main fuse or service size

Tick your appliances: the calculator estimates the power drawn at the same time (usual diversity) and recommends the smallest supply of your country that covers it — kVA subscription, main fuse rating or service size.

Updated on BS 7671 · NEC

Inputs

Rules applied: BS 7671:2018+A4:2026 — United Kingdom (beta, IET Wiring Regulations 18th Edition) · beta rules, to be checked locally

Appliances
W

Sum of the heater powers (0 if none).

W

Result

Recommended supply

60 A

Estimated simultaneous demand8.5 kW
Sizes offered60 A · 80 A · 100 A

Estimate with usual simultaneity factors (appliances ×0.5, heating ×0.8). It replaces neither an electrician nor your supplier.

Estimate for planning only. Switch off before any work and have it checked by a qualified electrician.

Next step · free

Turn this result into a real plan

Draw your rooms, place sockets and lights: Circuia checks every rule as you go and builds the board schedule.

Open the free editor →Free · no sign-up to start
</> Embed this tool on your website

Free, no sign-up. Paste this code into your page (blog, contractor site, forum): the tool shows up and stays up to date.

How it works

  • Each appliance is counted with a usual simultaneity factor (cooking and laundry ×0.5, heating ×0.8).
  • The result is compared with the supply sizes offered in the selected country.
  • US: a quick estimate only — use the NEC 220 service load calculator for a code calculation.

Frequently asked questions

Is a 60 A main fuse enough?

For a home without electric heating, an EV charger or an electric shower, often yes. Add those and 80–100 A is usual; an EV charger with load management avoids most upgrades.

What does the result not include?

Starting currents, long-term growth and the network operator's own rules. Ask your supplier or an electrician before changing the supply.

Is 100 A service enough for a US house?

Often for a gas-heated home without EV charging. Electric heat, heat pumps and EVSEs usually push to 200 A — run the NEC load calculation to know.

Design aid

For your actual home, move to the editor

Draw your home or describe it to the AI: Circuia places the points, checks the rules in real time and generates the consumer unit, single-line diagram and bill of materials.

Open the free editor

Other free tools