Use case · Electrical contractors

Residential electrical plan software for electrical contractors

Residential jobs eat drafting time: a floor plan for the permit, a panel schedule, a materials list for the bid, then changes when the homeowner moves the island. Circuia draws the plan from the rooms, places receptacles by the NEC 210.52 rules, builds the branch circuits and the panel schedule, checks GFCI / AFCI and wire sizing and exports it all on Letter paper. Pro is $55 a month plus sales tax, with a 14-day free trial; Team covers shops with several estimators.

Updated on Last checked NEC (NFPA 70) 2023

Key facts

  • 01Equip the rooms places receptacles by 210.52: 6 ft wall rule, 24 in countertop rule, 3 ft from basins, hallways of 10 ft or more, plus switched lighting outlets.
  • 02Auto-wire builds the branch circuits: 14 AWG / 15 A lighting, 12 AWG / 20 A receptacles, 2 × 20 A small-appliance circuits, a 20 A bathroom circuit, 240 V two-pole range, water heater and EV circuits.
  • 03Exports on Letter paper: floor plan with symbols, panel schedule / circuit directory, single-line diagram, materials list.
  • 04A share link lets the homeowner, GC or designer see the plan.
  • 05Pro $55/month, Team $149/month, plus sales tax; 14-day free trial on Pro. One-off Project Pass $45 plus sales tax for a single home.

Every job is in someone's jurisdiction

Where the time goes on a residential job, and what Circuia takes over

Residential paperwork: by hand or CAD vs in Circuia
TaskUsual wayIn Circuia
Permit floor planCAD or hand sketch, symbols placed one by oneDraw the rooms on a grid in feet and inches; Equip the rooms places receptacles and switched lights by the 210.52 rules
Receptacle layout checkTape-measure logic: 6 ft walls, 24 in countertopsPlaced by the rules, and flagged when you move something
CircuitsGrouped by hand on the planAuto-wire: lighting, receptacles, small-appliance, bathroom and 240 V two-pole circuits, editable
Panel scheduleSpreadsheet retyped for each jobGenerated from the circuits: number, breaker, poles, wire size, what it feeds
Materials list for the bidCounted from the planGenerated: devices, breakers, wire by size
Code review before submittingExperience and checklistsCheck for GFCI / AFCI, wire vs breaker, small-appliance and bathroom circuits, two-pole 240 V, with smoke-alarm and service reminders
Homeowner changesRedraw, re-export, re-sendEdit the plan; the schedule and materials list follow

What it doesn't do: it doesn't compute the service load calculation yet, it doesn't place smoke alarms for you, and its plan symbols are not the ANSI Y32.9 set (the PDF carries its own legend). It is built for dwellings, not commercial work.

The NEC rules behind the plan

  • Receptacles (210.52): no point along a wall more than 6 ft from a receptacle; countertops so that no point is more than 24 in from one; one within 3 ft of each basin; a receptacle in hallways of 10 ft or more.
  • Required circuits (210.11(C)): at least 2 small-appliance circuits of 20 A, a 20 A bathroom circuit, 20 A laundry and garage circuits.
  • Conductors (240.4(D)): 14 AWG on 15 A, 12 AWG on 20 A, 10 AWG on 30 A; NM-B at its 60 °C ampacity (8 AWG on 40 A).
  • GFCI (210.8(A)): bathrooms, kitchens (all receptacles since 2023), garages, outdoors, laundry, basements, within 6 ft of sinks; AFCI (210.12(A)): kitchens, living areas, bedrooms, closets, hallways, laundry.
  • 240 V loads: range, water heater and EV on two-pole breakers across L1 and L2; EV breaker at least 125 % of the charger rating (625.40).
  • Panel: circuit directory (408.4); service reminders for the emergency disconnect (230.85) and surge protection (230.67).

Each rule is explained in the US guides: NEC overview, receptacle spacing, GFCI and AFCI by room and panel schedule template.

Faster bids, fewer back-and-forths with homeowners

A bid is easier to win when the homeowner can see what they are paying for. Send the share link: they see the floor plan with every receptacle, switch and light. When they ask for two more receptacles in the bedroom or a different island, you edit the plan once and the panel schedule and materials list follow.

The materials list gives you the device, breaker and wire quantities to price. The panel schedule goes into the permit set and, after the job, becomes the circuit directory in the panel door. The single-line diagram shows the service, panel and branch circuits on one sheet.

For the permit itself, see how to draw an electrical plan for a permit: what offices usually ask for, rough-in and final inspection.

Pro for you, Team for the shop

Circuia plans in US dollars (sales tax added at checkout where applicable)
PlanPriceWho it's forIncluded
Free$0Trying it on a real jobDrawing, Equip the rooms, auto-wire and the NEC check
Project Pass$45 one-off, plus sales taxA homeowner, or a single jobPDF exports and materials list for one home
Pro$55/month, plus sales taxAn electrician or estimatorUnlimited projects, PDFs with your branding, materials lists and quotes, the assistant; 14-day free trial
Team$149/month, plus sales taxA shop with several estimatorsEverything in Pro, extra seats ($35/month each), projects shared across the shop, priority support
Cancel the trial from your account before it ends and you won't be charged. Full details on the pricing page.

Compare plans or open the editor and draw your next job.

What you should know before relying on it

Found a rule that doesn't match your jurisdiction or the code text? Tell us at contact@circuia.com: corrections from working electricians keep the rules accurate.

Common mistakes

  • Retyping the panel schedule by hand after the plan changes: the circuit numbers drift from the drawing.
  • Bidding from a plan that hasn't been checked for the small-appliance, bathroom and laundry circuits.
  • Sending the homeowner a PDF for every change instead of one share link.
  • Assuming the software knows your city's amendments: the check follows NEC 2023 by default.

Frequently asked questions

Is Circuia suitable for permit drawings?

It produces a floor plan with symbols and legend, a panel schedule, a single-line diagram and a materials list on Letter paper, which covers what many offices ask for on a residential job. Whether the drawing is accepted is up to the AHJ: some want a specific format, a load calculation (Circuia doesn't compute it yet) or a stamp. The US rules pack has not been reviewed by a US master electrician.

Which NEC edition does Circuia check against?

NEC 2023 by default, the most widely adopted edition, with the IRC smoke and CO alarm rules as reminders. Massachusetts, Minnesota, Texas and Washington have moved to 2026, and many jurisdictions have local amendments, for example on GFCI for ranges and dryers. The check is a design aid: your knowledge of the local code stays the final check.

How much does Circuia cost for an electrical contractor?

Pro is $55 a month plus sales tax, with a 14-day free trial: unlimited projects, branded PDFs, materials lists and the assistant. Team is $149 a month plus sales tax for shops with several estimators, with extra seats at $35 a month each. For a single job, the Project Pass is $45 one-off plus sales tax.

Can homeowners see the plan?

Yes. Send a share link: the homeowner, general contractor or kitchen designer sees the plan in the browser. When something changes, you edit the project once; the panel schedule and materials list follow the plan, so the next export matches what the homeowner approved.

Does Circuia replace a licensed electrician or the inspection?

No. It is a design and drafting tool. The US rules pack is built from public sources and not reviewed by a US master electrician. The work still needs a permit where required, a licensed electrician where your state or city requires one, and the rough-in and final inspections by the AHJ.

Design aid

Design the installation with this country's rules

Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.

Open a free sample plan with these rules