Use case · Electrical contractors
Residential electrical plan software for electrical contractors
Residential jobs eat drafting time: a floor plan for the permit, a panel schedule, a materials list for the bid, then changes when the homeowner moves the island. Circuia draws the plan from the rooms, places receptacles by the NEC 210.52 rules, builds the branch circuits and the panel schedule, checks GFCI / AFCI and wire sizing and exports it all on Letter paper. Pro is $55 a month plus sales tax, with a 14-day free trial; Team covers shops with several estimators.
Updated on Last checked NEC (NFPA 70) 2023
Key facts
- 01Equip the rooms places receptacles by 210.52: 6 ft wall rule, 24 in countertop rule, 3 ft from basins, hallways of 10 ft or more, plus switched lighting outlets.
- 02Auto-wire builds the branch circuits: 14 AWG / 15 A lighting, 12 AWG / 20 A receptacles, 2 × 20 A small-appliance circuits, a 20 A bathroom circuit, 240 V two-pole range, water heater and EV circuits.
- 03Exports on Letter paper: floor plan with symbols, panel schedule / circuit directory, single-line diagram, materials list.
- 04A share link lets the homeowner, GC or designer see the plan.
- 05Pro $55/month, Team $149/month, plus sales tax; 14-day free trial on Pro. One-off Project Pass $45 plus sales tax for a single home.
Every job is in someone's jurisdiction
Where the time goes on a residential job, and what Circuia takes over
| Task | Usual way | In Circuia |
|---|---|---|
| Permit floor plan | CAD or hand sketch, symbols placed one by one | Draw the rooms on a grid in feet and inches; Equip the rooms places receptacles and switched lights by the 210.52 rules |
| Receptacle layout check | Tape-measure logic: 6 ft walls, 24 in countertops | Placed by the rules, and flagged when you move something |
| Circuits | Grouped by hand on the plan | Auto-wire: lighting, receptacles, small-appliance, bathroom and 240 V two-pole circuits, editable |
| Panel schedule | Spreadsheet retyped for each job | Generated from the circuits: number, breaker, poles, wire size, what it feeds |
| Materials list for the bid | Counted from the plan | Generated: devices, breakers, wire by size |
| Code review before submitting | Experience and checklists | Check for GFCI / AFCI, wire vs breaker, small-appliance and bathroom circuits, two-pole 240 V, with smoke-alarm and service reminders |
| Homeowner changes | Redraw, re-export, re-send | Edit the plan; the schedule and materials list follow |
What it doesn't do: it doesn't compute the service load calculation yet, it doesn't place smoke alarms for you, and its plan symbols are not the ANSI Y32.9 set (the PDF carries its own legend). It is built for dwellings, not commercial work.
The NEC rules behind the plan
- Receptacles (210.52): no point along a wall more than 6 ft from a receptacle; countertops so that no point is more than 24 in from one; one within 3 ft of each basin; a receptacle in hallways of 10 ft or more.
- Required circuits (210.11(C)): at least 2 small-appliance circuits of 20 A, a 20 A bathroom circuit, 20 A laundry and garage circuits.
- Conductors (240.4(D)): 14 AWG on 15 A, 12 AWG on 20 A, 10 AWG on 30 A; NM-B at its 60 °C ampacity (8 AWG on 40 A).
- GFCI (210.8(A)): bathrooms, kitchens (all receptacles since 2023), garages, outdoors, laundry, basements, within 6 ft of sinks; AFCI (210.12(A)): kitchens, living areas, bedrooms, closets, hallways, laundry.
- 240 V loads: range, water heater and EV on two-pole breakers across L1 and L2; EV breaker at least 125 % of the charger rating (625.40).
- Panel: circuit directory (408.4); service reminders for the emergency disconnect (230.85) and surge protection (230.67).
Each rule is explained in the US guides: NEC overview, receptacle spacing, GFCI and AFCI by room and panel schedule template.
Faster bids, fewer back-and-forths with homeowners
A bid is easier to win when the homeowner can see what they are paying for. Send the share link: they see the floor plan with every receptacle, switch and light. When they ask for two more receptacles in the bedroom or a different island, you edit the plan once and the panel schedule and materials list follow.
The materials list gives you the device, breaker and wire quantities to price. The panel schedule goes into the permit set and, after the job, becomes the circuit directory in the panel door. The single-line diagram shows the service, panel and branch circuits on one sheet.
For the permit itself, see how to draw an electrical plan for a permit: what offices usually ask for, rough-in and final inspection.
Pro for you, Team for the shop
| Plan | Price | Who it's for | Included |
|---|---|---|---|
| Free | $0 | Trying it on a real job | Drawing, Equip the rooms, auto-wire and the NEC check |
| Project Pass | $45 one-off, plus sales tax | A homeowner, or a single job | PDF exports and materials list for one home |
| Pro | $55/month, plus sales tax | An electrician or estimator | Unlimited projects, PDFs with your branding, materials lists and quotes, the assistant; 14-day free trial |
| Team | $149/month, plus sales tax | A shop with several estimators | Everything in Pro, extra seats ($35/month each), projects shared across the shop, priority support |
Compare plans or open the editor and draw your next job.
What you should know before relying on it
Found a rule that doesn't match your jurisdiction or the code text? Tell us at contact@circuia.com: corrections from working electricians keep the rules accurate.
Common mistakes
- Retyping the panel schedule by hand after the plan changes: the circuit numbers drift from the drawing.
- Bidding from a plan that hasn't been checked for the small-appliance, bathroom and laundry circuits.
- Sending the homeowner a PDF for every change instead of one share link.
- Assuming the software knows your city's amendments: the check follows NEC 2023 by default.
Frequently asked questions
Is Circuia suitable for permit drawings?
Which NEC edition does Circuia check against?
How much does Circuia cost for an electrical contractor?
Can homeowners see the plan?
Does Circuia replace a licensed electrician or the inspection?
Design aid
Design the installation with this country's rules
Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.
Written by
Circuia team
Written by the Circuia team from the sources listed and from the editor's rules pack for this country: the values in the tables are the ones Circuia uses.
Published · updated
Sources
Sources used for this page, official texts first:
Related pages
- CircuiaCircuia for electriciansCircuia for UK electricians: plan, consumer unit schedule and single-line diagram built to BS 7671 (beta), materials list and client PDF. 14-day trial.
- CircuiaPricing: free, Project Pass €29, Pro €49/monthCircuia plans: Free to explore, Project Pass at €29 incl. VAT for a homeowner project, Pro at €49 excl. VAT/month and Team at €129 excl. VAT/month for electricians. 14-day trial.
- GuideHow to draw an electrical plan for a permit (US homes, NEC 2023)What US permit offices ask for on a residential electrical plan: receptacles, lights, smoke alarms, panel schedule, load calc and symbols, step by step.
- GuidePanel schedule template for a house (NEC 408.4 circuit directory)A panel schedule template for a house: the columns to fill, a filled 200 A example with L1/L2 positions, NEC 408.4 labeling rules and 110.26 working space.
- GuideNEC 2023 for homes: the residential rules that matter (National Electrical Code)NEC 2023 for one- and two-family homes: required circuits, receptacle spacing, GFCI/AFCI, wire sizes, panel and permits. Plus a free NEC compliance check.