Code · Canada
Canadian Electrical Code for houses: the CE Code 2024 rules that matter (and Québec)
The Canadian Electrical Code, Part I (CE Code, CSA C22.1) sets the wiring rules for Canadian homes, adopted province by province. Most provinces are on the 2024 edition; Québec applies its own chapter V, based on the 2021 edition. This guide covers what matters for a house: 120/240 V branch circuits, where receptacles go, GFCI and AFCI, the panel, and who may do the work.
Updated on Last checked CSA C22.1:24 (CE Code) · beta
Key facts
- 01Most provinces and territories apply the CE Code 2024 (26th edition), Ontario through the OESC. Québec applies the Code de construction, chapter V, based on the 2021 edition with Québec amendments, in force since 26 March 2026.
- 02Homes are fed 120/240 V single-phase, 60 Hz: 120 V circuits on L1 or L2; range, dryer, water heater, baseboards and EV charger at 240 V on a 2-pole breaker.
- 03Copper wire and breaker: 14 AWG → 15 A, 12 AWG → 20 A, 10 AWG → 30 A, 8 AWG → 40 A; at most 12 outlets on a 15 A circuit (Rule 8-304).
- 04Receptacles: no point along a usable wall more than 1.8 m from one; at least 2 kitchen counter circuits (15 A split or 20 A T-slot receptacles).
- 05Class A GFCI near sinks, tubs, showers and outdoors; combination AFCI on receptacle circuits, except the counter, fridge and bathroom-only circuits.
- 06Permits differ by province: ESA notification in Ontario, Technical Safety BC permits, municipal permits elsewhere. In Québec, only a licensed master electrician may do the work.
Which CE Code edition applies in your province?
CSA Group publishes the Canadian Electrical Code, Part I every three years. It only applies once a province or territory adopts it, usually with amendments: Ontario's version is the Ontario Electrical Safety Code, British Columbia's the BC Electrical Code, Québec's the chapter V – Électricité of its Construction Code. For a house, the edition that counts is the one in force on the date of the permit or notification.
| Province or territory | Code | Edition |
|---|---|---|
| Ontario | Ontario Electrical Safety Code (OESC) | 29th ed., based on CEC 2024 (since 1 May 2025) |
| British Columbia | BC Electrical Code | CEC 2024 with BC amendments |
| Alberta, Saskatchewan, Manitoba | CE Code with provincial amendments | CEC 2024 |
| Atlantic provinces, Yukon, NWT | CE Code with amendments | CEC 2024 |
| Nunavut | CE Code | 2018 edition |
| Québec | Code de construction, chapitre V – Électricité | CEC 2021 with Québec amendments |
In Québec, the new chapter V has been in force since 26 March 2026. The old chapter, based on the 2015 CE Code, may still be used for work started before October 17, 2027, but the RBQ recommends designing to the new one. Watch the rule numbers: Section 26 was renumbered in 2018 and again in 2021, so older guides quote other numbers.
Supply voltage, service size and the panel
A Canadian house is supplied at 120/240 V single-phase, three-wire: two line conductors (L1 and L2) and a neutral. Receptacles and lights run at 120 V between one line and the neutral; large appliances run at 240 V between the two lines on a 2-pole breaker. The panel spreads the 120 V circuits over L1 and L2 to balance the load.
The minimum service is calculated with Rule 8-200: living area, space heating, range, water heater and, since 2024, EV charging (with simplified rules and energy management systems). In practice a new house gets a 100 A or 200 A service; in Québec, where electric baseboard heating dominates, 200 A is common and the connection follows Hydro-Québec standard E.21-10.
- Leave spare spaces in the panel for future circuits (Rule 8-108); Québec adds two spaces for a 2-pole EV breaker while the EV infrastructure is not completed.
- Label every circuit in the panel directory on the door.
- Grounding and bonding follow Section 10; neutral and ground are bonded at the service only.
Wire sizes, breakers and outlets per circuit
| Wire | Largest breaker | Typical use |
|---|---|---|
| 14 AWG | 15 A | Receptacles, lighting |
| 12 AWG | 20 A | T-slot counter receptacles, bathroom |
| 10 AWG | 30 A | Dryer, water heater, baseboards |
| 8 AWG | 40 A | Range, EV charger |
| 6 AWG | 50 A | Large appliances |
Rule 8-304 limits a 15 A circuit to 12 outlets and a 20 A circuit to 16. Lighting outlets count just like duplex receptacles. Circuia's auto-wiring stays a little below the limit to keep a margin.
Where receptacles go, room by room
The CE Code mostly sets where receptacles go rather than a count per room. In finished rooms, no point along the floor line of a usable wall (900 mm or wider) may be more than 1.8 m from a receptacle. Doorways, fireplaces and floor-level windows break the wall line.
| Room | Requirement | Protection |
|---|---|---|
| Living room, bedrooms, dining room | 1.8 m rule along usable walls | AFCI |
| Kitchen counter | No point of the counter more than 900 mm from a receptacle; islands and peninsulas; at least 2 circuits | GFCI within 1.5 m of the sink; no AFCI on counter circuits |
| Bathroom | A receptacle within 1 m of the basin, at least 1 m from the tub or shower | Class A GFCI |
| Laundry room | Washer receptacle plus one more; dedicated circuit | GFCI near the laundry sink |
| Attached garage | One receptacle per car space | AFCI as applicable |
| Outdoors | At least two receptacles (Québec: at ground-floor level) | GFCI within 2.5 m of grade |
Counter receptacles are either 15 A split receptacles (each half on its own circuit, 14/3 cable on a handle-tied 2-pole 15 A breaker) or 20 A T-slot receptacles on 12 AWG. Every receptacle in a dwelling is tamper-resistant, and outdoor receptacles get a weatherproof in-use cover.
GFCI and AFCI: where are they required?
A Class A GFCI protects people from shock. It is required for receptacles within 1.5 m of a sink, tub or shower, and for outdoor receptacles within 2.5 m of grade (Rule 26-704). It can be a breaker in the panel or the first receptacle of the circuit.
A combination AFCI protects against fire. It covers 125 V receptacle circuits rated 20 A or less in a dwelling unit (Rule 26-658), except kitchen counter, fridge and bathroom-only circuits. A dual-function breaker provides both GFCI and AFCI.
Range, water heater, baseboards and EV charger
- Range: 40 A circuit on 8 AWG, 14-50R receptacle, 240 V 2-pole breaker.
- Water heater: 30 A on 10 AWG for a 4,500 W tank, continuous load.
- Dryer: 30 A on 10 AWG, 14-30R receptacle.
- Electric baseboards: 240 V, loaded to 80 % of the breaker at most; heating circuits of 30 A at most in a dwelling (Rule 62-114).
- EV charger: dedicated circuit sized at 125 % of the charger current unless an EV energy management system is used (Rule 86-300); Circuia proposes 40 A on 8 AWG.
In Québec, every new single dwelling with a garage, carport or parking area needs basic EV infrastructure from the panel to an outlet box near the parking spot (chapter V, Rule 86-202), counted in the service calculation whether or not a charger is installed. The old chapter called for a 40 A, 240 V provision; the 2026 value is still to be confirmed.
Permits and who may do the work, by province
| Province | Paperwork | Who may do the work |
|---|---|---|
| Ontario | Notification of work to the ESA, inspection | Licensed electrical contractor, or a homeowner in their own home |
| British Columbia | Permit from Technical Safety BC or the city | Licensed contractor, or the owner of an owner-occupied single-family home |
| Other provinces | Municipal or provincial permit, inspection | Varies; homeowner permits are common |
| Québec | Déclaration de travaux to the RBQ by the contractor; connection request to Hydro-Québec for a new or modified service | Master electrician only (RBQ licence subclass 16, member of the CMEQ) |
Wherever you are, the work needs a permit or notification and an inspection before the walls are closed. A homeowner who may not do the work can still prepare a clear plan, decide where receptacles and lights go, and ask several electricians for quotes on the same basis.
Smoke and carbon monoxide alarms
Alarms come from the building code (National Building Code 9.10.19 and the provincial codes). In a new house they are hard-wired and interconnected with battery backup: one in every bedroom, one on every storey including the basement, and one in the hallway near the bedrooms. A carbon monoxide alarm is required with a fuel-burning appliance or an attached garage.
Electrical plan software with a CE Code check
Choose Canada when you create a project in Circuia, then the province (Québec switches to the chapter V variant). Auto-wire builds the 120 V circuits on L1 and L2, puts the counter receptacles on 2 circuits of 20 A, gives 240 V loads a 2-pole breaker and sets the GFCI and AFCI badges. The check flags undersized wire, too many outlets on a circuit and missing protection.
The PDF comes out on Letter paper with the plan, the panel, the single-line diagram and the materials list (NMD90 cable, 5-15R and 14-50R receptacles). See electrical plan software for Canada or draw your plan to the CE Code.
Common mistakes
- Following a guide written for an older edition: Section 26 was renumbered twice and the AFCI scope changed.
- Putting the whole kitchen counter on one circuit, or counter receptacles on an AFCI circuit shared with the living room.
- Using 14 AWG wire on a 20 A breaker.
- Forgetting GFCI on outdoor receptacles or near the laundry sink.
- In Québec, starting work without a master electrician and a déclaration de travaux.
- Building a new house in Québec without the EV infrastructure for the parking spot.
Frequently asked questions
Which edition of the Canadian Electrical Code applies to my house?
Can a homeowner do their own electrical work in Canada?
How many receptacles does a room need under the CE Code?
Where is GFCI protection required in a Canadian house?
What size service does a new house need?
Does Circuia replace an electrician or the inspection?
Design aid
Design the installation with this country's rules
Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.
Written by
Circuia team
Written by the Circuia team from the sources listed and from the editor's rules pack for this country: the values in the tables are the ones Circuia uses.
Published · updated
Sources
Sources used for this page, official texts first:
- ESA — 2024 Ontario Electrical Safety Code, 29th edition
- ESA — Bulletin 26-18-15, AFCI and GFCI (PDF)
- Technical Safety BC — Section 26 directive
- Technical Safety BC — Top 10 changes of the 2024 CE Code
- City of Winnipeg — AFCI bulletin 2026-002-E
- Québec.ca — Construction Code chapter V update (2026)
- RBQ — Transition period extended (26/08/2026)
- Gazette officielle du Québec — chapter V draft regulation (2025, PDF)
- Electro-Federation Canada — CE Code adoption by province
Related pages
- CircuiaElectrical plan software for CanadaDraw a residential electrical plan online against the Canadian Electrical Code: branch circuits, GFCI, AFCI, panel, materials list. Canada pack in beta.
- GuideNEC 2023 for homes: the residential rules that matter (National Electrical Code)NEC 2023 for one- and two-family homes: required circuits, receptacle spacing, GFCI/AFCI, wire sizes, panel and permits. Plus a free NEC compliance check.
- OverviewElectrical wiring codes and standards: US NEC, UK, Ireland, NordicsHome wiring rules explained: the US NEC 2023, the UK's BS 7671, Ireland, Norway, Sweden, Denmark and Finland, with the Circuia editor for each.
- CircuiaPricing: free, Project Pass €29, Pro €49/monthCircuia plans: Free to explore, Project Pass at €29 incl. VAT for a homeowner project, Pro at €49 excl. VAT/month and Team at €129 excl. VAT/month for electricians. 14-day trial.