Software · Canada
Circuia draws the electrical layout of a house or a suite in your browser: you draw the floor plan, place receptacles, lights and appliances, and the software builds the 120/240 V branch circuits, the panel and the materials list. The Canada pack checks the CE Code 2024, with a Québec variant for chapter V; it is in beta. Permits and inspections stay with the licensed electrician.
Last checked CSA C22.1:24 (CE Code) · beta
01
Floor plan, circuit directory, panel and materials list come out of one project. The PDF carries your logo, address and business number, and the materials list is the base of your quote.
02
A clean electrical layout with standard symbols to coordinate a new build or a basement suite with the electrician and compare quotes on the same base.
03
Decide where receptacles, lights and the EV charger go before work starts. Several provinces let you wire your own owner-occupied home under a homeowner permit; Québec does not. Circuia prepares the plan, it does not do the work.
Trace the walls on the grid or import an existing plan (image or PDF) as a background. Areas are calculated for you, in metres.
Receptacles, counter receptacles, lights, switches, baseboards and appliances: with the mouse, or by asking the AI assistant.
Auto-wire builds the branch circuits: 120 V circuits balanced on L1 and L2, 240 V loads on 2-pole breakers, GFCI and AFCI where the code asks for them. The rules run in real time.
Floor plan, panel, single-line diagram and materials list go out as a Letter-size PDF to the client, the builder or the inspector (from the Project Pass).
01
Receptacles and lights with at most 12 outlets on a 15 A circuit (16 on 20 A), 14 AWG on 15 A and 12 AWG on 20 A, at least 2 kitchen counter circuits.
02
Range 40 A on 8 AWG, water heater 30 A on 10 AWG, baseboards and a 40 A EV charger on 2-pole breakers, with the load balanced between L1 and L2.
03
Class A GFCI near sinks, tubs, showers and outdoors, combination AFCI on receptacle circuits with the counter and bathroom exemptions: every breaker of the panel shows its badge.
04
Panel view with positions and spare spaces, 120/240 V service (100 or 200 A; 200 A is typical with electric heat), and a circuit directory ready for the panel door.
05
NMD90 14/2 and 12/2 cable, 5-15R and 5-20R tamper-resistant receptacles, 14-50R range receptacle, GFCI and AFCI breakers, boxes and load centre: a base for the quote and the supplier order.
06
Pick Québec when you create the project: chapter V wording, Hydro-Québec service, the déclaration de travaux by the master electrician and the EV infrastructure required in new homes.
Circuia checks a dwelling plan against the rules explained in the Canadian Electrical Code guide. The table gives an extract, with the values the editor uses. The CE Code mostly sets where receptacles go (no point along a usable wall more than 1.8 m from one) rather than a count per room.
| Topic | Reference | What is flagged |
|---|---|---|
| Wire and breaker | CEC 14-104 | Breaker too large for the wire (14 AWG over 15 A, 12 AWG over 20 A) |
| Outlets per circuit | CEC 8-304 | More than 12 outlets on a 15 A circuit |
| Counter receptacles | CEC 26-722, 26-654 | Fewer than 2 kitchen counter circuits |
| GFCI | CEC 26-704 | Receptacle near a sink, tub or shower, or outdoors, without Class A GFCI |
| AFCI | CEC 26-658 | Receptacle circuit without combination AFCI |
| 240 V loads | CEC 14-010, 26-744 | Range, water heater or baseboards on a single-pole breaker |
| EV charger | CEC 86-300, 8-104 | EV circuit below 125 % of the charger current |
| L1 / L2 balance | Practice | Panel loaded unevenly between the two legs |
| Service and permit | CEC 8-200, provinces | Reminders: service calculation, permit or notification, inspection |
The Canadian Electrical Code, Part I (CSA C22.1) is adopted province by province, often with amendments. Most provinces and territories are on the 2024 edition (26th): Ontario through the Ontario Electrical Safety Code, British Columbia, Alberta, Saskatchewan, Manitoba and the Atlantic provinces.
Québec applies the Code de construction du Québec, chapitre V – Électricité: the 2021 CE Code with Québec amendments, in force since 26 March 2026. Circuia has a Québec variant of the Canada pack for it, chosen per project.
In Ontario, work is filed with the ESA (notification) and a homeowner may wire their own home. In British Columbia, Technical Safety BC or the city issues permits, including a homeowner permit for an owner-occupied single-family home. Elsewhere, municipal or provincial permits apply.
In Québec, only a master electrician holding an RBQ licence and member of the CMEQ may do electrical work; the contractor files the déclaration de travaux and requests the connection from Hydro-Québec. Circuia reminds you of these steps in the editor; it files nothing.
| Need | CAD, spreadsheets, templates | Circuia |
|---|---|---|
| Electrical plan symbols | Libraries to assemble | Built in |
| CE Code check | By hand, code book open | Real time (beta) |
| Circuits, GFCI, AFCI, L1 / L2 | By hand | Proposed automatically |
| Panel and circuit directory | Drawn separately | Generated from the plan |
| Materials list (NMD90, 5-15R, 14-50R) | By hand | Generated |
| Quote base | Copied by hand | Exported (CSV, JSON) |
| Plan | Price | For | Included |
|---|---|---|---|
| Free | $0 | Explore | Plan editor, real-time CE Code check (beta), automatic circuits and panel, up to 3 active projects |
| Project Pass | $59 | Homeowners | Letter-size PDF export (plan, panel, single-line diagram), materials list, AI assistant (account required) |
| Pro | $75 / month | Electricians | Unlimited projects, PDFs with your business details, materials list as a quote base, AI assistant |
Design aid
Design the installation with this country's rules
Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.