Skip to content
circuia
Editor

The country sets the standard for new projects and the currency.

Standard · New Zealand

AS/NZS 3000 in New Zealand: the 2018 Wiring Rules, mandatory from 13 November 2026

AS/NZS 3000, the Wiring Rules, is the standard every electrical installation in New Zealand must meet. The 2018 edition with Amendments 1, 2 and 3 replaced the 2007 edition in the Electricity (Safety) Regulations 2010 and is the only cited edition for new work from 13 November 2026. For a house, that means 30 mA RCDs of type A, F or B on socket-outlet and lighting circuits, testing to Section 8, and a Certificate of Compliance for every fixed-wiring job.

Updated on Last checked AS/NZS 3000:2018 + A1–A3 · beta

Key facts

  • 01From 13 November 2025 to 13 November 2026, electrical workers could use AS/NZS 3000:2007 (Amendments 1 and 2) or AS/NZS 3000:2018 (Amendments 1, 2 and 3); from 13 November 2026 new work must use the 2018 edition (WorkSafe NZ).
  • 02Every Certificate of Compliance (CoC) must name the edition used, year and amendments included.
  • 03Homes need 30 mA RCD protection on socket-outlet, lighting and hand-held equipment circuits; new RCDs must be type A, F or B — type AC is no longer enough for new work.
  • 04The Australian rule of at most 3 final subcircuits per RCD is Australia-only; it is still good practice to spread circuits over at least 2 RCDs.
  • 05Fixed wiring is prescribed electrical work for a licensed electrician; homeowners may only do limited work under regulation 57, inspected before connection.

What is AS/NZS 3000 and why does it matter in New Zealand?

AS/NZS 3000, “Electrical installations (known as the Australian/New Zealand Wiring Rules)”, is a joint standard published by Standards Australia and Standards New Zealand. It sets how low-voltage installations are designed, built and tested: protection against electric shock and overcurrent, cable selection, switchboards, earthing, wet areas and verification. Australia and New Zealand share the same document, with clauses marked “Australia only” or “New Zealand only” where the two countries differ.

In New Zealand the standard is not voluntary. The Electricity (Safety) Regulations 2010 cite AS/NZS 3000 in Schedule 2, and an installation built to the cited edition is deemed to comply with the fundamental safety principles of the regulations. The regulator is WorkSafe New Zealand; the Electrical Workers Registration Board (EWRB) licenses the people allowed to do the work.

The paperwork depends on the type of work, not just on the standard: a Certificate of Compliance for most fixed wiring, an Electrical Safety Certificate when an installation is connected, and a Record of Inspection for high-risk work. All of these name the edition of AS/NZS 3000 that was used.

The switch to AS/NZS 3000:2018 on 13 November 2026

For more than a decade New Zealand kept citing AS/NZS 3000:2007 with Amendments 1 and 2, while Australia moved to the 2018 edition in 2019. The Electricity (Safety) Amendment Regulations 2025 changed Schedule 2: from 13 November 2025 electrical workers could choose either edition, and from 13 November 2026 new work must use AS/NZS 3000:2018 including Amendments 1, 2 and 3.

Which edition of the Wiring Rules applies in New Zealand
PeriodEdition for new workSource
Before 13 November 2025AS/NZS 3000:2007 + A1 + A2Electricity (Safety) Regulations 2010, Schedule 2
13 November 2025 to 13 November 2026Either the 2007 edition (+ A1, A2) or the 2018 edition (+ A1, A2, A3)Electricity (Safety) Amendment Regulations 2025, WorkSafe NZ
From 13 November 2026AS/NZS 3000:2018 + A1 + A2 + A3WorkSafe NZ
Trade sources differ on whether the last day of the 2007 edition is 12 or 13 November 2026; WorkSafe NZ gives 13 November 2026 for the mandatory use of the 2018 edition.

The change does not force anyone to upgrade an existing installation: maintenance and replacement can still follow the rules the installation was built to, as allowed by regulation 59. What changes is the reference for new work, alterations and additions, and the wording of the certificates. New Zealand also modified a few clauses of the 2018 edition through Schedule 2, notably on RCD types and on switching the neutral; electricians should work from the cited text with those modifications.

RCDs in a New Zealand home

RCDs (residual current devices, often combined with the circuit-breaker as an RCBO) are the main protection against electric shock in a home. According to trade summaries of the 2018 edition, residential socket-outlet, lighting and hand-held equipment circuits need 30 mA RCD protection in New Zealand (clause 2.6.3.3.1). The Australian clause that extends the requirement to every final subcircuit, hard-wired cooktop and hot water cylinder included, is marked “Australia only”.

RCD rules for New Zealand homes, compared with Australia
RuleNew ZealandAustralia
Circuits needing a 30 mA RCDSocket-outlet, lighting and hand-held equipment circuits (cl. 2.6.3.3.1)Every final subcircuit of a home (cl. 2.6.3.2.2)
RCD typeType A, F or B for new work; RCDs open active and neutral (cl. 2.6.2.2.3, as modified)Type AC banned in new work since 1 May 2023
Circuits per RCDNo limit found; Circuia keeps 3 as good practiceAt most 3 final subcircuits per RCD
Number of RCDsGood practice: at least 2, lighting split between themAt least 2 when there is more than one final subcircuit
TestingEvery RCD tested with an instrument, not only the test buttonOperating time and current recorded
Clause numbers from eCertify and Qualtec summaries; AS/NZS 3000:2018 itself was not read for this page.

Why spread the circuits? If the whole house sits behind one RCD, a single fault in an outdoor socket-outlet or a damp appliance cuts the lights everywhere, at night. Circuia's auto-wiring therefore puts every circuit behind a type A 30 mA RCD, at most 3 circuits per RCD, with the lighting circuits on different RCDs. In New Zealand these are flagged as information, not errors, because they are good practice rather than a New Zealand clause.

Arc fault detection devices (AFDDs) have their own New Zealand clause (2.9.7), which requires them on final subcircuits up to 20 A in some fire-risk locations. Ordinary bedrooms are not among the places reported by the trade summaries, so Circuia only suggests considering an AFDD on bedroom socket-outlet circuits.

Circuits, cables and the switchboard

Most New Zealand houses have a single-phase 230 V, 50 Hz supply, typically protected by a 60 A service fuse, with MEN earthing (multiple earthed neutral): the neutral and earth are linked at the main switchboard, with a main earthing conductor to an electrode. Larger homes and some rural properties have a three-phase supply. Your lines company's connection rules set the details.

Usual final subcircuits in the Circuia New Zealand pack
CircuitBreakerCopper TPS cableNote
Lighting10 A1.5 mm²1.5 mm² protected at 16 A at most
Socket-outlets (power points)20 A2.5 mm²2.5 mm² protected at 20 A at most
Cooktop or range32 A6 mm²Isolating switch nearby
Hot water cylinder20 A2.5 mm²Isolating switch adjacent; often on a controlled (ripple) tariff
Heat pump20 A2.5 mm²Isolator next to the outdoor unit; check the nameplate
EV charger32 A6 mm²Dedicated circuit and RCD, DC fault detection
Values of the Australian pack, reused for New Zealand (same Wiring Rules); installation conditions of AS/NZS 3008.1.2 not checked. Always size to the actual cable route and grouping.

AS/NZS 3000 limits the voltage drop to 5 % from the point of supply to any point of the installation (clause 3.6). Circuia estimates it per circuit from the cable route drawn on the plan and suggests the next cable size when a long run goes over the limit.

Bathrooms, laundries and kitchens

Section 6 of AS/NZS 3000 divides bathrooms and showers into zones. No socket-outlet is allowed in zones 0 and 1; zone 2 extends 0.6 m beyond the bath or shower up to 2.25 m, where only a shaver outlet or an RCD-protected socket-outlet inside a cupboard is accepted, and no socket-outlet may be within 0.3 m in zone 3. Circuia flags points drawn too close to a bath or shower.

In the kitchen, no socket-outlet or light switch should sit within 150 mm of the cooktop, and a fixed cooktop needs an isolating switch within 2 m, not on the appliance itself. Circuia reminds you of these when a cooktop is placed.

Certificate of Compliance, ESC and Record of Inspection

Prescribed electrical work is classified by risk under the Electricity (Safety) Regulations 2010, and the category decides the paperwork. The electrician who did or supervised the work issues the Certificate of Compliance (CoC) after testing; the person who connects the installation to the supply issues the Electrical Safety Certificate (ESC), which confirms that it is safe to use. High-risk work must also be inspected by a licensed electrical inspector, who issues a Record of Inspection, and it is entered in WorkSafe's high-risk database.

Certificates by risk category (WorkSafe NZ)
CategoryExamplesCertificates
Low riskLike-for-like replacement of fittingsElectrical Safety Certificate
GeneralNew circuits, an extension, a new houseCertificate of Compliance + Electrical Safety Certificate
High riskMains work, work on some special installations, homeowner work that needs certificationCertificate of Compliance + Record of Inspection + Electrical Safety Certificate
Summary; regulations 6A and 65 to 74 of the Electricity (Safety) Regulations 2010 set the exact categories and deadlines.

Testing follows Section 8 of AS/NZS 3000: continuity of the earthing conductors, insulation resistance, polarity, correct circuit connections, earth fault-loop impedance and RCD operation. New Zealand asks for every RCD to be tested with an instrument (trip time and current), not just with its test button.

Can you do your own electrical work in New Zealand?

Only a little. The law lets a homeowner do a limited amount of electrical wiring work in a home they own and live in, under regulation 57 of the Electricity (Safety) Regulations 2010 and the code of practice NZECP 51. The finished work must be tested and connected by a licensed electrical inspector, who checks that it is safe before it is energised. Work on the main switchboard, the mains and the main earth is reserved for licensed people.

Planning an AS/NZS 3000:2018 installation with Circuia

Choose New Zealand when you create the project. The editor uses 230 V single-phase with MEN earthing, sizes lighting at 10 A on 1.5 mm², socket-outlets at 20 A on 2.5 mm² and the cooktop at 32 A on 6 mm², puts every circuit behind a type A 30 mA RCD (at most 3 per RCD), flags type AC RCDs and socket-outlet or lighting circuits without RCD protection, and reminds you of the CoC and ESC. The circuit schedule, single-line diagram and bill of materials (AS/NZS 3112 outlets, TPS cable) follow. Read more on the New Zealand electrical plan software page.

Circuia plans for New Zealand (prices in NZD)
PlanPriceWhat you get
FreeNZ$0Plan editor, live AS/NZS 3000 check (beta), automatic circuits, up to 3 active projects
Project PassNZ$75 incl. GST, one-offPDF exports, materials list, testing checklist
ProNZ$95 a month or NZ$950 a year, excl. GSTUnlimited projects, PDFs with your NZBN
TeamNZ$239 a month or NZ$2,390 a year, excl. GSTShared projects; extra seat NZ$59 a month

Open the editor set up for New Zealand (free, in your browser), compare with other countries' standards or see all prices.

Common mistakes

  • Writing “AS/NZS 3000:2007” on a Certificate of Compliance for new work started after 13 November 2026.
  • Fitting type AC RCDs in new work: New Zealand now expects type A, F or B.
  • Putting the whole house behind one RCD, so one fault leaves every room in the dark.
  • Assuming the Australian rules apply unchanged: RCDs on every circuit and three circuits per RCD are Australia-only clauses.
  • Energising homeowner wiring before a licensed electrical inspector has checked and connected it.
  • Fitting a socket-outlet or light switch within 150 mm of the cooktop.

Frequently asked questions

When did AS/NZS 3000:2018 become mandatory in New Zealand?

From 13 November 2026, new electrical work in New Zealand must follow AS/NZS 3000:2018 including Amendments 1, 2 and 3. Between 13 November 2025 and that date, electricians could choose the 2007 or the 2018 edition. Existing installations do not have to be upgraded because of the change.

Is AS/NZS 3000 the same in Australia and New Zealand?

It is the same document, but some clauses apply only in Australia or only in New Zealand, and New Zealand modifies a few clauses through the Electricity (Safety) Regulations. The best-known difference for homes: Australia requires an RCD on every final subcircuit with at most three per RCD, New Zealand on socket-outlet, lighting and hand-held equipment circuits.

Do I need a Certificate of Compliance for new wiring?

Yes. Fixed wiring is prescribed electrical work, and the licensed electrical worker who did or supervised it must issue a Certificate of Compliance naming the edition of AS/NZS 3000 used. An Electrical Safety Certificate follows when the installation is connected, and high-risk work also needs a Record of Inspection.

What is the difference between a CoC and an ESC?

The Certificate of Compliance (CoC) certifies that the prescribed electrical work was done and tested to the standard. The Electrical Safety Certificate (ESC) is issued when the installation is connected to the supply and confirms that it is safe to use. Low-risk work may only need an ESC.

Is AS/NZS 3000 available as a free PDF?

No. AS/NZS 3000:2018 is a paid standard sold by Standards New Zealand and Standards Australia; the Electricity (Safety) Regulations 2010 and WorkSafe NZ guidance are free online. This page summarises public sources for homes and does not replace the standard.

How much does Circuia cost in New Zealand?

The Free plan covers drawing and the live check for 3 projects. The Project Pass costs NZ$75 incl. GST, once; Pro costs NZ$95 a month excl. GST, with a 14-day free trial.

Does Circuia certify an installation to AS/NZS 3000?

No. Circuia checks a plan against its New Zealand rules pack, which is in beta and built from public sources, and produces the circuit schedule, single-line diagram and materials list. Only a licensed electrician can do, test and certify the work.

Design aid

Design the installation with this country's rules

Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.

Open a free sample plan with these rules

Written by

Circuia team

Written by the Circuia team from the sources listed and from the editor's rules pack for this country: the values in the tables are the ones Circuia uses.

Published · updated