BS 7671 explained: the UK wiring regulations for homes (18th Edition, A4:2026)

BS 7671, the IET Wiring Regulations (18th Edition), sets the rules for low-voltage installations in the UK. The current text is BS 7671:2018+A4:2026, published on 15 April 2026. For a home it decides how socket circuits are laid out (rings of 32 A on 2.5 mm²), which circuits need a 30 mA RCD, where sockets may go in a bathroom and how the work is certified.

Updated on Last checked BS 7671:2018+A4:2026 · beta

Key facts

  • 01Current edition: BS 7671:2018+A4:2026 (Amendment 4, published 15/04/2026). A3:2024 is withdrawn on 15/10/2026; no 19th Edition has been published.
  • 02Socket circuits are limited by floor area, not by a number of sockets: ring 32 A / 2.5 mm² up to 100 m², radial 20 A / 2.5 mm² up to 50 m².
  • 03In a new home practically every final circuit is behind a 30 mA RCD: sockets (411.3.3), lighting (411.3.4), cables buried < 50 mm (522.6.202/203) and bathrooms (701).
  • 04Bathroom: zones 0, 1 and 2 only; 230 V sockets at least 2.5 m from the boundary of zone 1.
  • 05Consumer units in homes must have a non-combustible enclosure (421.1.201).
  • 06In England and Wales most new circuits and every consumer-unit change are notifiable under Part P, usually self-certified by a registered competent person with an EIC.

What is BS 7671 and where does it apply?

BS 7671, “Requirements for Electrical Installations”, is published jointly by the IET and BSI. It is a British Standard, not a law, but it is the recognised way to meet the legal requirements: the Electricity at Work Regulations, Part P of the Building Regulations in England and Wales, the Scottish Building Standards and the electrical safety rules for rented homes all point to it. Every competent-person scheme (NICEIC, NAPIT, ELECSA…) assesses its members against it.

The 18th Edition was published in 2018. Its amendments are consolidated: Amendment 4:2026 (published 15 April 2026 and usable immediately) replaces A2:2022 and A3:2024, and the previous consolidated text is withdrawn on 15 October 2026. A4 adds, among other things, stationary batteries (Chapter 57), functional earthing for ICT (section 545), Power over Ethernet (section 716), recognises Protective Neutral Bonding (PNB) and changes how EICR observations are coded. Rumours aside, no 19th Edition has been announced for publication.

BS 7671 and the building rules of each UK nation
NationBuilding rules for electrical workNotifiable / controlled work
EnglandBuilding Regulations 2010 Part P, Approved Document P (2013)New circuit, consumer-unit replacement, work in a bath/shower special location
WalesPart P (Welsh version since 2014)As England, plus additions and alterations in kitchens, bathrooms and outdoors
ScotlandBuilding (Scotland) Regulations, Technical Handbook Domestic 2022, Standards 4.5 and 4.6Work needing a building warrant; minimum sockets and lighting points (4.6)
Northern IrelandBuilding Regulations (NI), Technical Booklet ENo Part P equivalent; BS 7671 applies
Source: Approved Document P 2013 (gov.uk), gov.wales, gov.scot Technical Handbook 2022, IET guidance on Part P.

Supply and earthing: what the design starts from

A British home is normally supplied at 230 V single-phase (tolerance +10 % / −6 %, ESQCR regulation 27) through a DNO cut-out fuse of up to 100 A. Most new supplies are TN-C-S (PME); older ones are often TN-S (earth from the cable sheath) and rural overhead supplies are TT (earth electrode). The designer uses the maximum external earth fault loop impedance (Ze) the DNO declares, and a prospective fault current of 16 kA for a single-phase supply up to 100 A.

Design values of the supply (IET On-Site Guide, ENA ER P23)
Earthing arrangementMaximum Ze declared by the DNOTypical use
TN-C-S (PME)0.35 ΩMost new connections
TN-S0.8 ΩOlder underground cables (lead sheath)
TT21 Ω (DNO earth only)Rural / overhead lines; the installation's own electrode is assessed separately

Automatic disconnection is then checked circuit by circuit against the maximum earth fault loop impedance (Zs) of the protective device. For type B circuit breakers and 0.4 s (Table 41.3), the limits are 7.28 Ω for a B6, 2.73 Ω for a B16, 2.19 Ω for a B20 and 1.37 Ω for a B32; values measured at room temperature should stay around 80 % of these.

Socket circuits: rings, radials and floor area

The feature that sets the UK apart is the ring final circuit: both ends of the cable return to the same 32 A breaker, so each socket is fed from two directions. BS 7671 Appendix 15 and the IET On-Site Guide give three standard socket circuits for BS 1363 (13 A fused plug) sockets. They are limited by the floor area served, and the number of sockets is unlimited as long as the expected demand stays within the rating.

Standard circuits for 13 A socket-outlets (Appendix 15 / On-Site Guide Table H2.1)
CircuitProtective deviceCopper cable (PVC/XLPE)Maximum floor area served
A1 — Ring30 or 32 A2.5 mm² (T&E 2.5/1.5)100 m²
A2 — Radial32 A4 mm²75 m²
A3 — Radial20 A2.5 mm²50 m²
The On-Site Guide gives a maximum length of about 106 m for a B32 ring in 2.5/1.5 mm² twin and earth (Ze ≤ 0.35 / 0.8 Ω). Source: IET On-Site Guide as reproduced by training providers; check the current OSG.
  • Plan at least two socket circuits in a house (typically one per floor) and consider a separate circuit for the kitchen.
  • A spur is a branch off a ring. An unfused spur may feed one single or one twin socket (or one fixed appliance); more than that needs a fused connection unit (FCU, 13 A BS 1362 fuse).
  • Never on a ring: immersion heaters and storage heaters. Cookers and hobs above 2 kW get their own circuit.
  • The 2.5 mm² ring is only acceptable in installation methods where the cable is not buried in thermal insulation (reference methods 100, 102, A or C).

Lighting, cooker, immersion heater, shower and EV circuits

Outside socket circuits, BS 7671 gives principles (Ib ≤ In ≤ Iz, voltage drop, disconnection times) rather than a fixed table. The values below are the usual domestic choices, which the Circuia UK pack also uses as defaults. Always check the cable length, the installation method and the manufacturer's instructions.

Usual final circuits in a UK dwelling (type B MCB or RCBO, twin and earth clipped direct or in plaster)
CircuitProtective deviceCableNotes
LightingB6 (B10 possible)1.0 or 1.5 mm²No maximum number of points; voltage drop ≤ 3 %
Cooker (via cooker control unit)B326 mm²B40 / 10 mm² for large range cookers; diversity 10 A + 30 % of the remainder
Immersion heaterB162.5 mm²Dedicated, no diversity, never on the ring
Electric shower (7.5–10.5 kW)B40 / B4510 mm² (6 mm² for short runs)Behind a 30 mA RCD like every bathroom circuit
Appliance or outdoor radialB202.5 mm² (SWA when buried)Outdoor sockets need 30 mA protection
EV charge point (7.4 kW)B326 mm² (or SWA)Dedicated circuit, see the EV section
Voltage drop limits (Appendix 4, public supply): 3 % for lighting, 5 % for other uses.
Current-carrying capacity of flat twin and earth cable, 70 °C, method C (Table 4D5)
Conductor1.0 mm²1.5 mm²2.5 mm²4 mm²6 mm²10 mm²
Iz, clipped direct / in plaster16 A20 A27 A37 A47 A64 A
Method 103 (cable surrounded by thermal insulation) derates heavily: 2.5 mm² falls to 13.5 A. Source: BS 7671 Table 4D5 as reproduced by Eland Cables.

RCDs, AFDDs and surge protection

Additional protection by a 30 mA RCD is required for socket-outlets up to 32 A (411.3.3), for lighting circuits in dwellings (411.3.4), for cables concealed less than 50 mm deep in walls or partitions without mechanical protection (522.6.202/203), for every circuit of a room containing a bath or shower (701.411.3.3) and for each EV charging point (722). In practice, every final circuit of a new home ends up protected.

  • No maximum number of circuits per RCD is fixed by the standard, but the installation must be divided to limit nuisance tripping. Two common boards: dual RCD (split load, circuits shared between two 30 mA RCDs) or full RCBO (one RCBO per circuit), now the usual choice.
  • Type A RCDs are the practical default; type AC is limited to equipment without DC components.
  • AFDDs (arc fault detection, BS EN 62606, 421.1.7) are required on socket circuits up to 32 A in higher-risk residential buildings, HMOs, purpose-built student accommodation and care homes, and recommended everywhere else.
  • Surge protection (SPD): since A2:2022 the risk calculation and the single-dwelling exemption are gone. A type 2 SPD is installed unless the owner explicitly declines it where the risk is only to equipment.

Bathrooms and shower rooms (Section 701)

Rooms containing a bath or shower have zones 0, 1 and 2 (zone 3 was removed in 2008). Zone 1 rises to 2.25 m above the floor (or the highest fixed shower outlet) above the bath or tray; without a tray it extends 1.2 m from the centre of the fixed water outlet. Zone 2 extends 0.6 m beyond zone 1.

What goes where in a UK bathroom
ItemRuleRegulation
All circuits of the room30 mA RCD701.411.3.3
Equipment in zones 1 and 2At least IPX4 (IPX5 where water jets are used)701.512.2
230 V socket-outletsAt least 2.5 m horizontally from the boundary of zone 1 (3 m before A2:2022)701.512.3
Shaver supply unit (BS EN 61558-2-5)Allowed in zone 2, out of direct spray701.512.3
SwitchesOutside the zones; cord-operated pull switches allowed701.512.3
Supplementary bondingMay be omitted when all circuits are RCD-protected and main bonding is in place701.415.2

Adding or altering anything within a bath or shower special location is notifiable work in England (and all bathroom work is notifiable in Wales).

EV charge points (Section 722)

  • Each charge point has its own final circuit and its own 30 mA RCD: type B, or type A/F with 6 mA DC detection (RDC-DD, usually built into the charger).
  • On a PME (TN-C-S) supply, a charge point that can serve a vehicle outdoors may not simply use the PME earth (722.411.4.1). The usual solution is an open-PEN device that disconnects all live conductors and the protective conductor within 5 s when the voltage leaves 207–253 V, or a TT earth electrode.
  • DNO notification: under the ENA connect and notify process, a charger or heat pump can be installed and then notified within 28 days when the home's maximum demand stays within 60 A per phase; otherwise apply first.
  • Chargers sold since 30 June 2022 must meet the Electric Vehicles (Smart Charge Points) Regulations 2021 (smart functions, default off-peak charging, randomised delay).

Consumer unit, heights and Scottish minimums

Since 2016, consumer units in domestic premises (garages and outbuildings included) must comply with BS EN 61439-3 and have a non-combustible enclosure, typically steel (421.1.201). In new dwellings in England, Approved Document P (through Part M) places the consumer-unit switches at 1350–1450 mm and sockets and switches between 450 and 1200 mm above the finished floor.

England, Wales and Northern Ireland set no minimum number of sockets or lighting points. Scotland does, for work under a building warrant:

Minimum provision in Scotland (Technical Handbook Domestic 2022, Standard 4.6)
SpaceMinimum
Each apartment (living room, bedroom, study)4 socket-outlets
Kitchen6 socket-outlets, of which 3 above the worktop, plus outlets for built-in appliances
Anywhere in the dwelling4 more socket-outlets, at least 1 in each hall or landing
LightingA lighting point in every circulation area, kitchen, bathroom, WC and any other space of 2 m² or more
Whether a twin socket counts as one or two outlets is not settled by the text we read: count conservatively.

Certificates, Part P and inspection

BS 7671 certificates and reports (Appendix 6)
DocumentWhen
EIC — Electrical Installation Certificate (with schedules of inspections and test results)New installation, rewire, new circuit, consumer-unit replacement
MEIWC — Minor Electrical Installation Works CertificateAddition or alteration to an existing circuit, no new circuit
EICR — Electrical Installation Condition ReportExisting installations; observations coded C1 (danger present), C2 (potentially dangerous), C3 (improvement recommended), FI (further investigation)
Building Regulations compliance certificateIssued by the competent-person scheme within 30 days of notifiable work (England, Wales)
  1. Registered competent person (NICEIC, NAPIT, ELECSA, Stroma…): the installer self-certifies and notifies; the usual route.
  2. Registered third-party certifier: inspects and tests work done by someone who is not registered.
  3. Building control body: notified before work starts, then inspects.

Private landlords in England must have an EICR at least every five years and fix C1/C2 defects within 28 days; Northern Ireland and Scotland have similar five-year rules.

Designing a BS 7671 installation with Circuia

Choose United Kingdom when you create the project (and England, Wales, Scotland or Northern Ireland as the nation). The editor then wires sockets as 32 A rings up to 100 m² or area-limited radials, adds spurs and FCUs, proposes one type A RCBO per circuit, sizes the lighting, cooker, immersion and EV circuits with the values above, checks the bathroom distances and, for Scotland, the Standard 4.6 minimums. The single-line diagram, board schedule and bill of materials follow.

Open the editor set up for the United Kingdom — free, in your browser.

Common mistakes

  • Counting sockets per circuit instead of checking the floor area a ring or radial serves.
  • Putting an immersion heater or storage heaters on the ring.
  • Fitting a 230 V socket closer than 2.5 m to zone 1 of a bathroom.
  • Leaving lighting circuits without RCD protection in a new home (required since 2018).
  • Installing a plastic consumer unit in a house or garage.
  • Using the PME earth for an outdoor EV charge point without open-PEN protection.

Frequently asked questions

What is the current version of BS 7671?

BS 7671:2018+A4:2026, the 18th Edition with Amendment 4, published on 15 April 2026. The previous consolidated version (A2:2022 + A3:2024) is withdrawn on 15 October 2026, after which new work should be designed and certified to A4. No 19th Edition has been published.

Is BS 7671 a legal requirement?

Not in itself: it is a British Standard. But the Building Regulations (Part P in England and Wales, Standards 4.5 and 4.6 in Scotland), the Electricity at Work Regulations and the rented-sector safety rules treat compliance with BS 7671 as the way to show an installation is safe, so in practice domestic work is expected to comply.

How many sockets can go on a ring main?

BS 7671 sets no maximum number of sockets. A 32 A ring in 2.5 mm² cable may serve up to 100 m² of floor area, provided the expected load is within the rating. Unfused spurs are limited to one single or twin socket each; larger branches need a fused connection unit.

Do lighting circuits need an RCD?

Yes. Since the 18th Edition (2018), regulation 411.3.4 requires 30 mA additional protection for AC final circuits supplying luminaires in dwellings. Combined with the rules for sockets and buried cables, virtually every final circuit of a new home is RCD-protected, often with one RCBO per circuit.

How far from a bath or shower can a socket be?

A standard 230 V socket-outlet must be at least 2.5 m horizontally from the boundary of zone 1 (it was 3 m before Amendment 2). A shaver supply unit to BS EN 61558-2-5 is allowed in zone 2, away from direct spray.

Can I do my own electrical work in England?

You may do minor, non-notifiable work, but it must still meet BS 7671. New circuits, consumer-unit replacements and work in bathroom special locations are notifiable: use a registered competent person, a registered third-party certifier or building control. Never work on live circuits.

Does Circuia certify an installation to BS 7671?

No. Circuia checks a design against its UK rules pack (in beta) and produces the plan, board schedule, single-line diagram and bill of materials. Only a competent person can inspect, test and certify the finished installation with an EIC or MEIWC.

Design aid

Design the installation with this country's rules

Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.

Open the editor for this country

Written by

Circuia team

Written by the Circuia team from the sources listed and from the editor's rules pack for this country: the values in the tables are the ones Circuia uses.

Published · updated

Related pages