Software · New Zealand

Electrical plan software for New Zealand: house wiring checked against AS/NZS 3000:2018

Circuia draws the electrical plan of a house or unit in your browser: you sketch the rooms, place power points, lights and appliances, and it builds the final subcircuits, the 30 mA RCDs, the switchboard and a bill of materials. The New Zealand pack checks AS/NZS 3000:2018 + A1–A3, cited from 13 November 2026; it is in beta. Testing and the Certificate of Compliance stay with the licensed electrician.

Last checked AS/NZS 3000:2018 + A1–A3 · beta

Who it is for

From plan to switchboard in 4 steps

  1. 01

    Draw

    Sketch the walls on the grid or trace over an existing floor plan (image or PDF). Room areas are calculated as you go.

  2. 02

    Place

    Double power points, lights, switches, cooktop, hot water cylinder, heat pump and EV charger: with the mouse, or by asking the AI assistant.

  3. 03

    Wire and check

    Auto-wiring builds the final subcircuits and puts them behind type A 30 mA RCDs, never more than 3 per RCD. The New Zealand rules run live and often offer a one-click fix.

  4. 04

    Export

    Plan, circuit schedule, single-line diagram, materials list and a testing checklist as PDF for the client, the builder or the inspector (from the Project Pass).

What Circuia does for New Zealand

What the New Zealand pack checks

Circuia checks a house plan against the values explained in the AS/NZS 3000 New Zealand guide. The table shows an extract, with the values the editor uses. AS/NZS 3000 sets no minimum number of socket-outlets per room: Circuia only makes comfort suggestions there.

Extract of the editor's checks
TopicReferenceWhat is flagged
Cable and breakerAS/NZS 3000 cl. 2.5.3Breaker too large for the cable (1.5 mm² above 16 A, 2.5 mm² above 20 A)
RCD on socket-outletsAS/NZS 3000 cl. 2.6.3.3.1Socket-outlet circuit without a 30 mA RCD
RCD on lightingAS/NZS 3000 cl. 2.6.3.3.1Lighting circuit without a 30 mA RCD
RCD typeAS/NZS 3000 cl. 2.6.2.2.3Type AC RCD in new work (type A, F or B needed)
Spread of circuitsGood practiceWhole house on one RCD, more than 3 circuits on one RCD (information)
Wet areasAS/NZS 3000 §6.2Socket-outlet or switch within 0.6 m of the shower or bath (zones 0 to 2)
CooktopAS/NZS 3000 cl. 4.7Socket-outlet or light switch within 150 mm, isolating switch reminder
EV chargerAS/NZS 3000 Appendix PShared circuit or RCD, undersized circuit, DC fault detection
Voltage dropAS/NZS 3000 cl. 3.6More than 5 % on the estimated cable route
CertificationElectricity (Safety) Regulations 2010Reminder: CoC, ESC on connection, Record of Inspection for high-risk work

AS/NZS 3000:2018 is mandatory from 13 November 2026

The Electricity (Safety) Amendment Regulations 2025 replaced AS/NZS 3000:2007 with AS/NZS 3000:2018 including Amendments 1, 2 and 3 in Schedule 2 of the Electricity (Safety) Regulations 2010. From 13 November 2025 electrical workers could use either edition; from 13 November 2026 new work must follow the 2018 edition, and every Certificate of Compliance must name it, year and amendments included (WorkSafe NZ).

Existing installations do not have to be upgraded because the cited edition changed. Circuia's New Zealand pack is written for new work and alterations to the 2018 edition.

Certificate of Compliance, ESC and inspection

Fixed wiring is prescribed electrical work: a licensed electrical worker does it, tests it and issues a Certificate of Compliance (CoC). When the installation is connected to the supply, an Electrical Safety Certificate (ESC) confirms it is safe to use. High-risk work, such as work on mains or homeowner wiring, also needs a licensed electrical inspector's Record of Inspection before connection.

Homeowners may do a limited amount of wiring in their own home under regulation 57 and NZECP 51, but the work must be inspected and connected by a licensed electrical inspector. Circuia prepares the plan and the circuit schedule; it issues no certificate.

Certificates by type of work (Electricity (Safety) Regulations 2010)
Type of workCertificates
Low-risk workElectrical Safety Certificate
General work (e.g. new circuits, a new house)Certificate of Compliance + Electrical Safety Certificate
High-risk work (e.g. mains, homeowner work)Certificate of Compliance + Record of Inspection + Electrical Safety Certificate
Source: WorkSafe NZ, risk categories and certification of prescribed electrical work.

Dedicated software or CAD and spreadsheets?

What a New Zealand rules pack changes
NeedCAD, spreadsheet, templatesCircuia
IEC 60617 symbolsLibraries to assembleBuilt in
AS/NZS 3000:2018 checksBy hand, Wiring Rules openLive (beta)
Circuits and RCD groupingBy handProposed automatically
Switchboard and single-line diagramDrawn separatelyGenerated from the plan
Materials list with AS/NZS 3112 outlets, TPS, RCBOsBy handGenerated
Circuit schedule and testing checklistRetypedPrepared

What Circuia does not replace

Free, Project Pass or Pro

Free, Project Pass or Pro
PlanPriceForIncluded
Free$0ExplorePlan editor, live AS/NZS 3000 check (beta), automatic circuits and switchboard, up to 3 active projects
Project Pass$75 incl. GSTHomeownersPDF export (plan, switchboard, single-line diagram), materials list, testing checklist for the CoC, AI assistant (account required)
Pro$95 excl. GST / monthElectriciansUnlimited projects, PDFs with your details and NZBN, materials list as a quote base, AI assistant
All prices →

Further reading

Frequently asked questions

Is Circuia free in New Zealand?

To start with, yes. The Free plan lets you draw, place points and see the live AS/NZS 3000 check (beta) for 3 active projects. The Project Pass (NZ$75 incl. GST, one-off) adds the PDF exports and the materials list. Pro (NZ$95 excl. GST a month, or NZ$950 a year) is for electricians and contractors, with a 14-day free trial.

Does Circuia check AS/NZS 3000:2018?

Yes, with a dedicated New Zealand pack, still in beta. It reuses the sizing of our Australian pack (same Wiring Rules) and the New Zealand scope of the RCD rules; it is built from public sources (WorkSafe NZ, legislation, trade guides) and has not yet been reviewed by a New Zealand inspector. It helps you design; it does not replace testing or the Certificate of Compliance.

Does Circuia issue the Certificate of Compliance?

No. Only the licensed electrical worker who did or supervised the work issues the CoC, and the ESC on connection. Circuia prepares the plan, the circuit schedule and a testing checklist to support them.

Which circuits need an RCD in a New Zealand house?

Under AS/NZS 3000:2018 as applied in New Zealand, socket-outlet, lighting and hand-held equipment circuits of homes need 30 mA RCD protection, and new RCDs must be type A, F or B. The Australian rule of at most 3 circuits per RCD does not apply in New Zealand, but Circuia still spreads circuits over several RCDs as good practice.

Can I wire my own house in New Zealand?

Only within the homeowner exemption of regulation 57 (with NZECP 51): limited work in your own home, inspected and connected by a licensed electrical inspector. Everything else is prescribed electrical work for a licensed electrician. Circuia is useful either way to plan the layout and talk to your electrician.

Why are prices in NZ dollars?

Visitors from New Zealand see New Zealand prices: the Project Pass includes GST, Pro and Team subscriptions are shown excl. GST (Team NZ$239 a month). You can change the country at any time with the country switcher.

Design aid

Design the installation with this country's rules

Draw the home or describe it to the AI: Circuia places the points, checks the country's rules in real time and generates the consumer unit, single-line diagram and bill of materials.

Open the editor for New Zealand